说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 防水煤岩柱留设
1.
A Study on the Engineering Geology Characteristics and on Reasonable Scale of Pillars for Protecting Water about the Overlying Strata of Mining Coal Seam in Wugou Coalmine;
五沟煤矿开采煤层上覆岩土体综合地质特征及防水煤岩柱留设问题研究
2.
Study on Reasonable Width of Coal and Rock Pillar under Thick Aquiferous Loose Bed;
厚含水松散层下煤岩柱合理留设研究
3.
A 3D Numerical Analysis of F_2 Fault Waterproof Pillar in Tao Yuan Coal Mine;
桃园煤矿F_2断层防水煤柱留设的三维数值分析
4.
The discussion about waterproof mine columniationpillar width in Small coal mines bare area
小煤窑采空区留设防水煤柱合理宽度的探讨
5.
Study on Retaining Safety Coal Pillar Against Sand with Fully Mechanized Caving under Thick Alluvium and Thin Bedrock;
厚松散层薄基岩下综放开采留设防砂煤岩柱研究
6.
Fluid-Solid Coupling Analysis of the Fault Waterproof Coal Pillar;
断层防水煤柱合理留设的流固耦合分析
7.
Investigating Reasonable Scale of Pillars for Protecting Workings Lying under Thrust Sheets;
推覆体下伏工作面防水煤柱合理留设的研究
8.
Numerical Modeling on Fluid-Solid Coupling for the Waterproof Coal Pillar Design
流-固耦合作用下防隔水煤柱留设的数值模拟
9.
Research on Safety Pillar against Water in No.2137 West Lower Working Face, Zhaogezhuang Coalmine, Kailuan
开滦赵各庄矿2137_(西下)工作面防水煤柱留设研究
10.
A tentative study on fault traversing roadways and the design method for water separation coal pillar
巷道过断层及断层防水煤柱留设方法初探
11.
Study on the Reasonable Retainning of the Waterproof Coal Pillar of Steep Medium & Thick Coal Seam with Hard Roof;
急倾斜坚硬顶板中厚煤层防水煤柱合理留设研究
12.
Studying the Feasibility of Waterproof Pillar under the Nappe Structure in Work Face 150801 of Xinji No. 1 Coal Mine;
新集一矿推覆体夹片下150801工作面防水煤柱留设可行性研究
13.
Methods of retaining water barrier and its stability analysis of steep working face
急倾斜工作面防水煤柱留设方法及其稳定性分析
14.
Analysis of Coal Mine Water-filled Conditions Under Thick Cenozoic and Coal Pillar Preserve
巨厚第四系下煤矿充水条件与煤柱留设的分析
15.
Calculation and evaluation on the safe width of fault waterpro of coal (rock) pillar
断层防水煤(岩)柱安全宽度的计算与评价
16.
Determination of waterproof rock pillar height with the top coal caving under sea
海下综放开采防水安全煤岩柱厚度的确定
17.
The Research of Reasonable Setting up Pillar Coal to Prevent Sand from Collapsing in the Moderate and Thick Unconsolidated Formation;
中厚松散层下防砂(塌)煤柱合理留设研究
18.
Discussion on Tertiary Hydro-geological Feature and Pillar Setting in Efflorescent Oxygenized Belt
第三系水文地质特征与风氧化带煤柱留设