1.
The Theoretical and Methodical Research on Surface Settlement and Pipeline Deformation Due to Construction Disturbance in Metro Tunnel Construction;
地铁隧道施工扰动对地表沉降和管线变形影响的理论和方法研究
2.
Research on the Displacement of the Pipe and the Deformation of Soil Around the Pipe Due to Tunnel Construction;
隧道施工扰动下邻近管线的位移及其周围土体变形的研究
3.
Study on Disturbance Range in Soft Rock with Drill Blasting Technology Tunnel;
软岩隧道钻爆法施工扰动范围的研究
4.
Analysis of Vibration Velocity Maximum of the Linging of Existing Tunnel by the Blasting of the Tunnel Near-by
邻近隧道爆破施工引起的既有隧道衬砌振动速度阈值分析
5.
Technical code for construction of highway tunnel
公路隧道施工技术规范
6.
Vibration Influence on the Existed Railway Tunnel by Blasting Construction of Underpass Diversion Tunnel and Countermeasures
引水隧洞下穿既有铁路隧道爆破施工振动影响及对策
7.
Study on the Accessary Technology of the Shodlow Burried Tunnel Construction in Sand Bed with Saturated Dynamic Water
饱和动态含水砂层浅埋隧道施工配套技术研究
8.
Methodology and Application of Dynamic Simulation and Information Management for Multi-arch Tunnel Construction;
连拱隧道施工动态仿真与信息化管理研究
9.
The Tiny Vibration of Structure Induced by Tunnelling Blasting;
隧道施工中爆破引起地面建筑物的微振动响应
10.
Study on the Characteristic of Blasting Vibration and Control Construction Technology of Wanshishan Tunnel;
万石山隧道爆破振动特性及施工控制技术研究
11.
Study on Dynamic Emulation on NATM Construction Processing DaPingLi Tunnel;
大坪里特长隧道NATM施工过程的动态仿真研究
12.
System Research of Surrounding Rock Mass Dynamic Classification in Highway Tunnel of Construction State;
高速公路隧道施工阶段围岩动态分级系统研究
13.
Dynamic Monitoring and FEM Simulation Analysis of Guanshan Tunnel;
冠山隧道施工动态监测与有限元仿真模拟
14.
Numerical Analysis of the Stability for the Surrounding Rock during Dynamic Construction Process of Large-span Tunnel;
大跨度公路隧道动态施工围岩稳定性数值分析
15.
Study on Dynamic Response during the Small Spacing Tunnels Blasting Excavation;
小间距隧道施工过程中的动力响应研究
16.
Effect of Mechanics and Optimum Process in Excavating Multi-arch Tunnel;
连拱隧道动态施工力学效应分析及优化
17.
Labor optimization in TBM construction of Qinling extra-long tunnel on Xi an-Ankang railway;
西安安康铁路秦岭特长隧道TBM施工劳动力优化
18.
The Study on Blasting Vibration of Xiamen Undersea Tunnel Constructed by Drilling and Blasting Method
厦门海底隧道钻爆施工爆破振动规律研究