说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 模糊项目调度
1.
Width-changeable Beam Search algorithm for fuzzy project scheduling;
一种模糊项目调度问题的变宽Beam Search算法
2.
Fuzzy dynamic programming method for progress adjustment of project mangement;
项目管理中进度调整的模糊动态规划方法
3.
Application of genetic algorithm in solving fuzzy resource-constrained project scheduling problem;
求解模糊资源受限项目调度问题的遗传算法
4.
Fuzzy Optimization Algorithm for Complex Product Development Project Scheduling Problem
复杂产品开发项目调度问题的模糊优化算法
5.
The Exploratory Research of the Fuzzy Synthetically Evaluating Method for the Successful Degree of Loan ltems;
贷款项目成功度模糊综合评价法探讨
6.
The Study on Fuzzy Technique of CSD-based Project Evaluation
基于顾客满意度的项目评价模糊技术研究
7.
Research on Construction Project Schedule Management Based on Fuzzy Comprehensive Evaluation;
基于模糊综合评价的工程项目进度管理研究
8.
R&D project portfolio selection decision-making analysis and thinking-based on fuzzy set theory and inspired by scheduling perspective
R&D项目组合选择的决策分析与思考——基于模糊集理论和启发调度视角
9.
Multi-objective decision making on reservoir flood operation by using fuzzy connection numbers
基于模糊联系数的水库多目标防洪调度决策
10.
Adjustment Model of Large-scale Project Network Plan Based on Hierarchical Fuzzy Optimization;
基于分级模糊优选的大型项目网络计划调整模型
11.
Fuzzy Multiobjects Constrained Investment Projects Selection Modeling;
模糊多目标有约束投资项目选择建模
12.
Decomposition and optimization methods for large-scale project schedules
大规模项目调度问题的分解和协调优化方法
13.
Maturity model of real estate project management based on fuzzy synthetic evaluation;
基于模糊综合评价法的房地产项目管理成熟度模型
14.
Modeling of the Flexible Resource-constrained Multi-mode Project Scheduling Problem;
柔性资源受限的多模式项目调度问题的建模
15.
Application of Multi-layer Fuzzy Comprehensive Evaluation in Organization Project Management Maturity;
多级模糊综合评估在组织项目管理成熟度中的应用
16.
To Study on the Bidding Evaluation of Project Management Bidding Based on Fuzzy Clustering and Grey Correlation Theories;
基于模糊聚类和灰色关联度的项目管理评标方法的研究
17.
Selection of Project Cooperation Members Based on Fuzzy Multi-granularity under Strategic Alliance;
战略联盟下基于模糊多粒度语言评价的项目合作成员选择
18.
Empirical Study on Post-evaluation of Success Degree of Power Plant Construction Project Based on Fuzzy Neural Network
基于模糊神经网络的电厂建设项目成功度后评价实证研究