1.
Deformation monitoring of typical landslides on the bank of Geheyan Reservoir on Qingjiang River
清江隔河岩水库典型滑坡体的变形特征
2.
Application of a One-Dimension Model of Vertical Temperature Distribution to Geheyan Reservoir
一维垂向水温分布模型在隔河岩水库中的应用与检验
3.
Researches on resettlement due to water resources projects with clients participation-On problems of immigrants of Gehe Rock on Qingjiang River;
业主制水利工程移民问题解析——基于清江隔河岩水库移民问题的思考
4.
Resettlement with Project Legal Person System-Research on Resettled People of Geheyan of Qing River;
“项目法人制”水利工程移民问题——以清江隔河岩库区移民问题为例
5.
Innovational spirit in construction of Geheyan Hydropower Station
隔河岩水电站工程建设中的创新精神
6.
Monitor Research of Interior of Geheyan Dam
清江隔河岩水利枢纽坝体内部监测研究
7.
Foundation deformation features of main dam section of Geheyan hydro-junction
隔河岩水利枢纽主要坝段基础变形特性
8.
Treatment measures to runner crackles of hydroturbine No.2 of Geheyan Hydropower Plant
隔河岩电厂2号水轮机转轮裂纹处理方案
9.
Formation Mechanism and Stability Analysis of the Pianshan Landslide in Geheyan Reservoir Area of the Middle Reaches of the Qingjiang River
清江中游隔河岩库区偏山滑坡形成机制及稳定性分析
10.
THE LAYERING OF DEEP KARST IN VALLEYS
河谷深岩溶的成层性——以辽宁观音阁水库为例
11.
Study on Stability Slope of Water and Electricity Reservoir on the Monkey Cliff Dadu River;
大渡河猴子岩水电库区斜坡稳定性研究
12.
Study on the Stability of the Rock Slopes of Dagangshan Reservoir in Daduhe River;
大渡河大岗山水库岩质岸坡稳定性研究
13.
Study on Mechanical Parameters of Rock Mass of Dam Foundation of Yujianhe Reservoir in Guizhou Province;
贵州省鱼简河水库坝基岩体力学参数研究
14.
Evaluation on Economical Benefit & Comprehensive Utilization Effect of Geheyan Hydroproject in the Past 10 Years;
隔河岩水电站投运十年来综合经济效益分析与评价
15.
Functions of Peak Regulation & Frequency Modulation of Geheyan Hydropower Station in Hubei Grid & Central China Grid;
隔河岩水电站在湖北、华中电网中的调峰调频作用
16.
Study on Triaxial Creep Mechanism and Creep Model of Mica-quartzose Schist at Dam Abutment of Heihe Reservoir
黑河水库坝肩边坡云母石英片岩三轴蠕变机理及蠕变模型研究
17.
Deformation failure characters and instability criterion of abutment rock slope in Heihe reservoir
黑河水库坝肩岩质边坡变形破坏特征及失稳判据
18.
CONSTRUCTION INSTALLATION AND ADJUSTMENT OF CHORD ARROW TRAVERSE FOR GEHEYAN HYDROPOWER PROJECT
隔河岩工程弦矢导线施工及安装调试