1.
Safety Analysis of Tailing Dam in Tailings Stoping Process
尾矿回采过程中尾矿坝的安全性分析
2.
Numerical simulation of gas migration in goaf in extracting stage
回采过程中采空区瓦斯运移数值模拟研究
3.
Numerical Analysis of Failure Zone of Steeply Pitching Thin Vein Stope in Jinqingding Mine
金青顶矿急倾斜薄矿脉回采过程采场破坏区域数值分析
4.
Prediction and visualization of destructive position of pillar and surrounding rock in deep mining
深井回采过程矿柱与围岩破坏预测及可视化验证
5.
Study on the Total-reflux Concentrating and No-reflux Withdrawing Process of Batch Distillation;
间歇精馏全回流浓缩—无回流采出过程的研究
6.
Aiming at the membrane fouling appeared in reclamation process, a physical method was utilized to wash the membrane.
对回收过程中的膜污染,采用了物理方法对膜进行反冲洗。
7.
An Initial Approach to Solution of the Problems Found in the Equipment Used for Coarse Coal Slime Recovery in Yangquan No.2 Colliery C.P.P.
针对阳泉二矿采用圆盘过滤机回收煤泥过程中产生的问题进行分析并提出解决问题的办法。
8.
Neither will it say that they shouldn't adopt an approach towards education that is too pragmatic, that reduces it to a painful process one endures for the sake of good returns later.
我也不会说他们不应该对教育采取过于务实的态度,为了将来的回报而让学习变成痛苦的过程。
9.
The automatic control in the whole heating process is realized by five stages. The configuration of control loops, control methods in every stage and master control program are described.
采用5个阶段实现加热全过程的自动控制。介绍了控制回路的设置、阶段的控制方法及主控程序。
10.
techniques of sampling during manufacture
制造过程中采样方法
11.
The relief of some of the internal strain energy of a previously cold-worked metal, usually by heat treatment.
冷塑性变形金属释放其部分应变能的过程叫回复,通常采用热处理的方法。
12.
The check valves shall utilize a single torsion spring design to minimize pressure drop through the assembly.
这种止回阀应该采用单扭力弹簧结构来将通过总成的压降减到最小程度。
13.
half-life of recurrent selection process
轮回选择过程的半衰期
14.
The Study of Re-entry Module s Wiggle and Anti-rotation Control during the Landing Process;
回收着陆过程返回舱摆动与减旋研究
15.
Discussion of Building Tending Felling Engineering Process System with System Engineering Analysis Method
采用系统工程分析方法构建抚育采伐工程过程系统的探讨
16.
Estimating Roadway Capacity Using the Simultaneous Spline Regression Model
采用样条回归模型估计高速公路通过能力(英文)
17.
Design of Trackless Development System and Extraction Technology for Maluping Mine;
马路坪矿无轨开拓工程与回采工艺设计研究
18.
The interview was pre-recorded.
采访过程是预先录制好的.