1.
120 tons of converter are equivalent to the bottom compound blowing technology in applying
120t转炉顶底复合吹炼工艺技术应用
2.
Practice on lining protection of the Top and Bottom Combined Blown Converter in the No.2 Steelmaking Plant of Angang
鞍钢二炼钢顶底复吹转炉护炉工艺实践
3.
Kinetic Modeling of Direct Alloying with Manganese Ore in Top and Bottom Combined Blown Converter
顶底复吹转炉内锰矿直接合金化的动力学模型
4.
Analysis and Practice of Optimization of Oxygen Lance Height During Catch Carbon Process in 260 t Combined Blowing Converter
260t顶底复吹转炉调整拉碳枪位的分析与实践
5.
Research and Application of Fettling with Slag in 30 t Top and Bottom Combined Blown Converter
30t顶底复吹转炉黏渣护炉技术的研究与应用
6.
quality basic oxygen process
底吹氧气转炉炼钢法
7.
Developments of top-blown copper converting technology in Houma smelter
侯马冶炼厂铜顶吹吹炼工艺的技术进展
8.
A STUDY ON ARGON-OXYGEN COMBINATION BLOWING PROCESS FOR LOW-CARBON CAST STAINLESS STEEL
氩-氧复合吹炼法生产低碳不锈铸钢的试验研究
9.
Fluid Mixing Characteristics in an AOD Converter Bath under Conditions of Combined Side and Top Blowing Process
侧顶复吹条件下AOD转炉熔池内流体的混合特性
10.
The Engineering Practice of High-speed Smelting about LD Process in No.1 Steelmaking Plant of the Ansteel Corporation
鞍钢一炼钢厂氧气顶吹转炉高速冶炼技术实践
11.
Analysis of High Nitrogen Steels Refining Factors With High Pressure and Bottom-Blown Nitrogen
高压-底吹氮法高氮钢精炼因素分析
12.
Lead smelting technology and the development of oxygen bottom blowing melting process
铅冶技术的发展及氧气底吹熔炼工艺
13.
Experimental Study on Smelting of High Nitrogen Steel with High Pressure and Bottom-blown Nitrogen
高压底吹氮法冶炼高氮钢的实验研究
14.
Development and Application of Multiplex End-point Forecasting System for Matte Converting in P-S Converters;
铜锍P-S转炉吹炼终点复合式预报系统的开发与应用
15.
Research and Application on Bottom Blowing System of Top-bottom Combined Blown Converter
复吹转炉底吹供气制度的研究与应用
16.
The l.d. process use a top-blow oxygen converter lined with heat-resistant brick.
L.D.炼钢法使用炉内砌有耐火砖的氧气顶吹转炉。
17.
Preliminary Exploration on Metal Element Behaviors in Lead Smelting Process of Oxygen-rich Top Blowing
富氧顶吹炼铅过程中金属元素行为初探
18.
Research on Copper Water Jacket of Lead Tapping Port for Top-blown Lead Smelting Furnace with Oxygen Enrichment
富氧顶吹炼铅炉放铅口铜水套的使用研究