说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 热源厂
1.
The Technology-Economical Analysis of the Heat Source Factory s First-Phase Project:a case study;
热源厂一期工程项目技术经济分析案例
2.
Potential Impact of Indoor Ground Surface on the Natural Ventilation in Heat Workshop
室内地表对热源厂房自然通风潜力影响研究
3.
Ponder for Architectural Design of Modern Industry Workshop--Plan and Design for Centralism Heating Project Heat Source Factory of Some City
对现代工业厂房建筑设计的思考——某城市集中供热工程热源厂的规划与设计
4.
On Heating with Heat Pump Technology Using Circulating Water of Power Plants as Heat Source
以电厂循环水为热源利用热泵技术供热的研究
5.
Study on Water Resources in the Third Project of Chen Ming Thermoelectricity Factory of Shandong;
山东晨鸣热电厂三期工程水资源研究
6.
Numerical Simulation of Natural Ventilation in Industrial Plant with Heat Source
带热源工业厂房自然通风的数值模拟
7.
Study on the Water Source Heat Pump System Utilizing Waste Heat in Power Plants;
利用电厂余热的水源热泵空调系统的研究
8.
Reformation of Treating Craftwork of Boiler Replenishing Water of Yibin Heat Source Company Thermo-Electric Plant;
宜宾热源公司热电厂锅炉补给水处理工艺改造
9.
The Research and Analysis of Straw Purchase System for De Yuan Jiu Tai Biologic Thermoelectricity Plant;
德源九台生物热电厂秸秆收购体系的研究分析
10.
Research on the Human Resources Management Problems for Thermalelectricity Station of Handan of Group of State Power Grid;
国电邯郸热电厂人力资源管理问题研究
11.
Design and application of exhaust gas for co-generation in Yangzhou Petrochemical Plant;
扬州石化厂干气资源用于热电联产的项目分析
12.
Improving Thermal Insulation Level and Strengthening Energy Management
我厂改善绝热工程状况加强能源管理小结
13.
Preliminary design of water source heating pump in waste water treatment factory of Qingxu
清徐县污水处理厂水源热泵系统初步设计
14.
Power Controlling System Transformation of No.5 Stove Electric Deduster in Hegang Heat Power Plant
鹤岗热电厂5~#炉电除尘器电源控制系统改造
15.
The design method of aircooled chiller used for cleaning air-conditioning systems in an electrical plant
某电子厂房采用风冷热泵机组作为洁净空调冷热源的设计思路
16.
The Study on Groundwater Numerical Simulation of Water Supply Source Site of Jinneng New Resource Thermo-electric Plant of Zuoquan in Shanxi Province;
山西左权晋能新能源热电厂供水水源地地下水数值模拟研究
17.
Increasing the wattage and/or voltage from factory original equipment can require changes to the water heater and/or the electric service.
对工厂原装的热水器增加电源功率和/或增加电源电压可能导致热水器和/或电路系统产生变化。
18.
Soar thermal power and fuel cells may provide good source of power for desalination plants.
太阳热能量与燃料电池可能为去盐工厂提供好的能量来源。