1.
Research and Application of the Cemented Backfilling Technology with Total Directly Discharged Tailings
直排全尾胶结充填技术的研究与应用
2.
Research and application of the full-tailing cemented filling technology with the low density
低浓度全尾胶结充填技术的研究与应用
3.
Reliability of Cemented Phosphgypsum Backfilling in Xinqiao Pyrite Mine
新桥硫铁矿磷石膏分层胶结充填技术可靠性研究
4.
Practice of Pre-setting Laneway in Underhand Drift Cut-and-Fill Stoping
下向进路式胶结充填采矿法中巷道预留技术实践
5.
Microleakage of continuous wave of condensation with different tapered gutta-percha in vitro
连续波充填技术配合不同锥度牙胶尖充填根管的微渗漏研究
6.
permeable consolidated gravel pack
可渗透胶结砾石充填体
7.
A Study on Application of Continuous-wave Condensation Technique with Thermoplasticized Gutta-percha;
连续波热牙胶根管充填技术的应用研究
8.
A Comparative Study of the Effect of Three Thermal Gutta-percha Canal Obturation Techniques;
三种热牙胶根管充填技术效果的比较研究
9.
Technology of Reinforcement with Grouting in Chamber for Belt Conveyor's head
胶带输送机机头硐室注浆充填加固技术
10.
Application of Fill Joint Technique of Sticky Tape With Five-Retardant and Steel Wire Rope
钢丝绳芯阻燃胶带填充式接头技术的应用
11.
A qualified cemented rockfill system has been developed in Xinqiao Pyrite Mine according to the key techniques and parameters of cemented rockfill derived from the model test of large stope.
通过大型采场模型模拟试验,得出了块石胶结充填新工艺实施中的关键技术与参数。
12.
multiple squeeze slurry pack technique
多次挤压砂浆充填技术
13.
one-trip gravel pack technique
一步法砾石充填技术
14.
Comparison of Different Gutta-percha Root Filling Techniques: Ultrafil 3D, Obtura Ⅱ and Lateral Condensation;
根管热塑牙胶注射加压技术与冷侧压充填的比较研究
15.
Through the experiments, the mixture ratio of cemented crushed stone backfilling materials was optimized.
通过试验,优化了碎石胶结充填料配比。
16.
Furthermore, a portion of space is filled with clay and cementing material.
而且,部分孔隙被粘土和胶结物质填充。
17.
Study on Improving the Early Strength of Filling
提高胶结充填体早期强度的试验研究
18.
In Vitro Comparison of the Obturation Density by Three Techniques;
三种根管充填技术体外充填密度的对比