1.
Study on the maximal driving length of dummy drift in uranium mines
铀矿井独头巷道最大掘进长度的研究
2.
Talking of Pressure and Effective Length for Cutter of EBH-132 Tunnel Roadheader
EBH-132型掘进机接地比压及有效长度探讨
3.
Brief Talks of Enhancing the Speed of Rapid Excavation of Comprehensive Bolting Support Tunnel
提高综掘锚杆支护巷道快速掘进速度的探讨
4.
Ventilation Technology of 8 km Heading at One End in North Tianshan Tunnel
北天山长大隧道8km独头掘进通风技术
5.
Safety is always the first consideration in tunneling and speed of advance is the second.
在掘进中,安全总是应该首先考虑的问题,掘进速度则放在第二位。
6.
What caused the steep increase of the progress?
掘进速度提高的原因是什么?
7.
Numerical Simulates Studying in roadway construction temperature field simulation
基于CFD技术的掘进巷道温度场模拟
8.
Prediction on penetration rate of TBM based on Monte Carlo-BP neural network
基于Monte Carlo-BP神经网络TBM掘进速度预测
9.
Matching Model of the Accuracy of Roadway Section Forming and the Precision of Sensor for Roadheader
掘进机断面成形精度与传感器精度的匹配模型
10.
Probe into ventilation at long distance driving drift in high yield and high efficiency mine
对高产高效矿井长距离掘进巷道通风的探讨
11.
Application of Wind Feed Technology Using the Long-distance High-power Fan in the Heading Face;
局扇长距离供风技术在掘进工作面中的应用
12.
Study on Excavation Disturbed Zone and Damage Zone in Surrounding Rock of Deeply Buried Long Tunnel by TBM Driving
深埋长隧洞TBM掘进围岩开挖扰动与损伤区研究
13.
Study on transportation system of long and large tunnel construction by TBM
长大隧洞掘进机施工洞内运输系统研究
14.
Study on the Simultaneous Lining Technology in the Long Tunnel Bored by Main Beam TBM
长大隧道敞开式掘进机施工中的同步衬砌研究
15.
Theory and Technology of the Primary and Permanent Waterproof in Roadway Excavation
掘进巷道初次与长期防水理论与技术研究
16.
A mathematical model of data mining for overreaction;
对过度反应现象进行数据挖掘的数学模型
17.
Selection on Depth and Diameter of Blasting Borehole for Rapid Heading of Mine Rock Roadway in Deep Level of Mine
煤矿深部岩巷快速掘进炮眼深度和直径选择
18.
Numerical simulation of concentration diffusion of harmful gas in heading face with forced ventilation
压入式通风掘进面有害气体浓度扩散数值模拟