说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 采矿设计优化
1.
Taking Xincheng Gold Mine as the example, the law of ground stress of metal mines and the optimization of mining design for underground mines are presented.
以新城金矿为实例,介绍了金属矿山地应力的规律性及地下矿山采矿设计优化方法;
2.
Optimization Design of Ore Accumulating Trench by Sublevel Open Stoping
分段空场采矿法聚矿堑沟的设计优化
3.
Analysis on Design Optimization of Roadway Layout in Jiaozuo Mining Area
焦作矿区采区巷道布置设计优化分析
4.
Optimization Design and Numerical Analysis of Excavating-filling Engineering for Lean Ore in Jinchuan No.2 Minefield
金川二矿贫矿开采充填设计优化及数值分析
5.
Mining Engineering in Mining Area Optimization Design
采矿系统工程在采区优化设计中的应用
6.
Based on Surpac Open-air Mining Plan Optimization Design System and Applied Research;
基于Surpac露天采矿计划优化设计系统及应用研究
7.
Design and optimization of a multi-degree-of-freedom articulated mechanism
海底采矿车多自由度铰接机构设计与优化
8.
Optimization Design of Mining District Under Complex Geological Condition in Yongxia Mining Area
永夏矿区复杂地质条件下采区的优化设计
9.
Optimization of Parameter on Top During Top-collapse Engineering and Research of Concerned Technology of Mining at East Part of Jinshandian Iron Mine;
金山店铁矿东区放顶工程优化设计及相关采矿技术的研究
10.
Study on Landslide and Optimization of Reinforcement Design in North Region of Shuichang Iron Mine;
水厂铁矿北区采场滑坡破坏及加固设计优化研究
11.
The Application of Digital Simulating Method in the Optimization on Mining System Design of Block Stoping;
阶段空场法采矿系统设计优化的数值分析方法及应用
12.
New Optimization Design Techniques of the Mining Schemes for Underground Metal Mine and Its Application
地下金属矿山回采方案优化设计新技术及其应用
13.
The Research of the Open-pit Short-term Stripping Plan CAD and Optimization;
露天矿短期采剥计划CAD及其优化研究
14.
Intelligent optimization for the first coal face project scheduling in coal mining
煤矿首采面开工进度计划的智能优化
15.
Optimization of the Design of Mining Area and to Mine Reasonably the Coal-Pillar of Mine Surface Plant;
优化采区设计 合理开采工业广场煤柱
16.
The Surface Mining Short-Period Plan System and Optimization;
露天煤矿短期开采计划编制系统及其优化
17.
Optimization and Modularization of ERT Data Acquisition System;
ERT数据采集系统的优化与模块化设计
18.
Improving Design for Optimizing the Existing Mine Ventilation System of Tonglushan Copper & Iron Mine;
铜绿山铜铁矿矿井通风系统优化改造设计研究