说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 东线工程
1.
Research on Municipal Sewerage Harness of Shandong Segment in East Route of South-to-North Water Diversion Project;
南水北调东线工程山东段城市污水治理工程规划研究
2.
Several Problems about Step Pump Stations in Eastern Route South-to-North Water Transfer Project
南水北调东线工程梯级泵站的几个问题
3.
Effects of the East Route of the South-to-North Water Transfer Project on the Ecological Environment of Nansi Lake;
南水北调东线工程对南四湖生态环境的影响
4.
Study on the Problem of Timely Water Supply to the Yellow River Through the East Line Project Diverting Water from South to North;
南水北调东线工程相机向黄河补水研究
5.
Modeling and Simulation about Water Price System of the East Route of South to North Water-Transfer Project;
南水北调东线工程水价系统建模及仿真
6.
Effect of South-to-North Water Transfer East Line Project on Water Environment of Jiangsu Province and Defending Strategies;
南水北调东线工程江苏段水环境问题及其对策
7.
Some considerations about "water bank" of east route of South-to-North Water Transfer project based on option theory;
期权理论与南水北调东线工程“水银行”设想
8.
Researches on operation and management system of Nansihu of East-Route of South-to-North Water Transfer Project;
南水北调东线工程南四湖运行管理体制研究
9.
Impact of divert water from the south to the north project on the fisheries of Nansi Lake;
南水北调东线工程对南四湖区渔业的影响研究
10.
Extra-Large West-to-East Natural Gas Transmission Project to Be Launched
中国特大的西气东输工程将全线开工
11.
Welding technology in winter of West to East Gas Pipeline Project Ⅱ
西气东输二线工程冬季施工焊接技术
12.
Application of Engineering Quantity Detailed List in Line Engineering Tender in West to East Gas Pipeline Project;
工程量清单在西气东输线路工程招标中的应用
13.
Engineering Geological Conditions of Tunnel Passage (East Line) between Shanghai and Chong Ming
沪崇越江通道(东线)工程地质条件
14.
Research on the Second West to East Pipeline Project Risk Management
西气东输二线管道工程风险管理研究
15.
Automatic Welding Procedure in Pipeline Construction of India East to West Gas Project
印度“东气西输”工程管线施工自动焊焊接工艺
16.
Research on Risk and Response for Project in Shandong Section of Eastern Route Project of South-to-North Water Diversion;
南水北调东线山东段工程风险及其应对研究
17.
Discussion on Weak Road-Bed Treatment Plan for the East Express Route of Zhongshan in Guangdong
广东中山东部快线工程软土路基处治方案探讨
18.
Understanding of Line Protection Replacement Project of 220 kV Long-Feng East Line
对220kV龙丰东线线路保护更换工程的认识