说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 综合机械化掘进
1.
Rapid Passing Through Fault Technology of Fully Mechanized Gateway Driving
煤巷综合机械化掘进快速过断层技术
2.
Speeding up Development in Rocks by Taking Advantages of Co-mechanization
发挥综合机械化优势 实现岩巷快速掘进
3.
Large-Scale Mechanized Mining Equipment Integrated Electrical and Mechanical Management
大型综合机电机械化采掘设备的管理
4.
Computer application in mechanized slope tunneling
计算机在斜井机械化掘进中的应用
5.
The Temporary Support Set in Fully-mechanized Excavation Draft
综掘巷道机械化临时护顶装置的研究与应用
6.
engineering boring and drilling devices
工程钻探和掘进机械
7.
Expediting Marketing and Industrialization Step of Straw Integration Using with Machine to Accelerate Agriculture Sustained Development
加快机械化秸秆综合利用市场化产业化步伐 促进农业可持续发展
8.
New Carter products, mining roadheader, with very high working efficiency, and good safety feature, obtain the aim of mining mechanization.
新产品掘进机工作效率高、全性能好,实现了采掘机械化。
9.
Regulations of Methane Discharge in Coal Laneway with Mechanized Speedy Drivage;
煤巷机械化快速掘进瓦斯涌出规律的探讨
10.
Allocation of Mechanized Operation Line for Rapid Heading in Deep Mine Large Cross Section Rock Roadway
深井大断面岩巷快速掘进机械化作业线配置
11.
New Achievements and Trends in Structure Synthesis and Optimization Design for Parallel Kinematic Mechanisms
并联运动机械结构综合及其优化设计研究的最新进展
12.
Discussion on Integral Mechanization Construction Technology of Rock Drift
岩石巷道综合机械化施工技术的探讨
13.
Research about the Synthesis Appraisal Index System of the Agricultural Mechanization;
农业机械化综合评价指标体系的研究
14.
Review of China Full-mechanized Mining Coal for 30 Years
我国综合机械化采煤发展30年回顾
15.
Comprehensive Analysis on Cutterhead Drive Transmission System of TB880E Tunnel Boring Machine
TB880E型掘进机刀盘驱动力传递装置综合分析
16.
Design of Hydraulic Loading System for a Composite Test Stand of Full Face TBM
全断面掘进机综合试验台加载液压系统设计
17.
Study on Colligate Optimal Kinematics and Dynamics Design of Hydraulic Excavator s Parametric Modeling;
液压挖掘机工作装置运动与动力综合优化研究
18.
2.using advanced science and technology;
2.农业机械化与先进的科技相结合;