1.
Design of lifetime predication system of reformer tubes
转化炉管剩余寿命综合预测系统的设计
2.
The Whole Process of Project Cost Management in the Dalian Petrochemical Hydrogen Furnace Refractory Project
大连石化制氢转化炉筑炉项目全过程成本管理
3.
EFFECT OF THE VARIATION OF FEED ON THE TEMPERATURE OF REFORMER TUBES AND COUNTERMEASURES
制氢原料变化对转化炉炉管温度的影响及对策
4.
Reformer is the key equipment in the hydrocarbon steam process while radiation reformer tube is the core of the total.
转化炉是烃类蒸汽转化工艺过程的关键设备,而转化炉的辐射段转化管更为关键的核心。
5.
The Research of Residual Lifetime Estimation of (101B) Hydrogen Reformer Tubes;
大型合成氨装置一段转化炉(101B)炉管的剩余寿命预测研究
6.
The First Heat of Converter Steelmaking after Fettling's Dephophorization Analysis and Optimize
转炉补炉第一炉脱磷分析及工艺优化
7.
Application of the heat pipe boiler in sulphuric acid production with smelter off-gas
热管锅炉在烟气制酸装置转化系统的应用
8.
The Optimization of Converter Process of Non-quenched and Tempered N80 Steel for Oil Well Pipe;
非调质N80油井管用钢转炉生产冶炼工艺优化
9.
Discussion on Daily Scheme Management for the 120t Converter-Hot Rolling Material System
120t转炉-热轧板材系统一体化日计划管理探讨
10.
Technical Reformation for Upper Clip Shaped Pipe System for Hydrogen Making Reformer in Ammonia Synthesis Plant
合成氨装置制氢转化炉上猪尾管系技术改造
11.
Analysis on causes for fracturing of drain tubes of the lower manifold of converter and treatment measures
转化炉下集气管导淋管破裂原因分析及处理措施
12.
Calculation method of tube thickness in tube heaters for petrochemical enterprises
石油化工管式炉炉管壁厚计算方法
13.
Optimum Study of Slag Splashing Technology to 50t Converters at Jiusteel;
酒钢50t转炉溅渣炉技术优化实验研究
14.
Flanged air and gas rotatable entries simplify burner piping manifolds.
法兰式空气和燃气旋转接口简化了炉头管线配置。
15.
Research on Intensifying Heat Transfer in Square Tubular Furnace;
方箱管式加热炉炉内的强化传热研究
16.
Small-scale Ethylene Cracking Furnace Tube Radiation Paragraph Domestic Reform
小乙烯裂解炉辐射段炉管国产化改造
17.
RESEARCH ON THE DEPHOSPHORIZATION OF REFINING PIPELINE STEEL X65 IN COMBINED BLOWING CONVERTER
复吹转炉冶炼X65管线钢脱磷工艺研究
18.
A DISCUSSION ON COKE DEPOSITION IN FURNACE TUBES OF DELAYED COKING UNIT
延迟焦化加热炉炉管内结焦问题的探讨