1.
WELDING QUALITY CONTROL OF INSTALLATION PROCESS FOR 150 t BOF SHELL
150t转炉炉壳安装焊接质量控制
2.
Analysis of Thermal Expansion Stress and Temperature Difference Stress for BOF Shell
转炉炉壳热膨胀应力和温度差应力的分析
3.
Calculation of Converter Tilting Torque Based on Virtual Technology
基于虚拟样机技术的转炉炉壳倾动力矩计算
4.
Strength analysis of spring-board coupling device between BOF shell and backing ring with FEM
转炉炉壳托圈弹簧板式联接装置的有限元强度分析
5.
Numerical Simulation of Temperature Field on the Surface of Converter Shell under Air-blown Cooling and Analysis of the Effect
喷气冷却转炉炉壳表面的温度场模拟计算和效果分析
6.
The outside of the converter is made of steel plates.
转炉的外壳由钢板制成。
7.
A New Converter Suspension System
新型实用的转炉托圈与炉壳悬挂装置
8.
The shell and cover of the waste gas preheating section and NOF heating furnace.
炉气预热段及NOF加热炉的炉壳及炉盖;
9.
Finite Element Analysis on Thermal-stress in Different Expansion Gap in BOF lining
转炉炉衬不同膨胀间隙的炉壳热应力有限元分析
10.
The shell and cover of the radiation tube heating furnace.
辐射管加热炉的炉壳及炉盖;
11.
The Bessemer Process uses a furnace called a "converter".
酸性转炉法使用称为“转炉”的高炉。
12.
revolving grate producer
回转炉篦式煤气发生炉
13.
rotary body producer
回转炉体煤气发生炉
14.
This iron is taken to the coverter, open-hearth funace or electric furnace to boil off the impurities.
这些铁被送到转炉,平炉或电炉去提纯。
15.
The First Heat of Converter Steelmaking after Fettling's Dephophorization Analysis and Optimize
转炉补炉第一炉脱磷分析及工艺优化
16.
Carbon ramming material is used on the spacer,the bottom of blast furnace and some other parts of the blast furnace.
高炉炉底垫层、炉底和炉缸环行碳块与炉壳间的间隙,炉底水冷管以上到炉底钢板。
17.
Stress Analysis of BF Hearth and Lining and Reinforcement Criterion for Longitudinally Cracked Shell
高炉炉缸的应力分析和炉壳开裂补强判据
18.
DEVELOPMENT RESEARCH OF STEEL USED IN FURNACE MANTLE OF BLAST FURNACE AND COMPLEMENT HOT-BLAST FURNACE
高炉及配套热风炉炉壳用钢拓展性研究