1.
Asphalt Coagulation Earthen Road Pavement Construction Joint Processing Craft Brief Analysis
沥青混凝土路面施工接缝处理工艺浅析
2.
Primary Exploration on Control of TBM Segment Displacement under Construction in the Tunnel
TBM施工中管片接缝错台控制措施初探
3.
Study of new joint technology for PVC waterproofing membrane
PVC防水卷材接缝施工新工艺研究
4.
Joints Grouting Construction Technology of Arch Dam in Goupitan Hydropower Station
构皮滩水电站拱坝接缝灌浆施工技术
5.
Simple Talking about Construction Method of Joints of Asphalt Mixture Pavement
浅谈沥青混合料路面接缝的施工方法
6.
Construction of wet joint of continuous bridge as simple-supported beam;
先简支后连续桥梁湿接缝的施工技术研究
7.
No jointing work in the whole waterproof layer reduced the hidden trouble of leakage and enhanced the waterproof effect.
整个防水层无接缝施工,减少了渗漏隐患,提高防水效果。
8.
Horizontal construction joint shall be set at the top of the slab.
5施工缝留设:水平施工缝留置于板顶面。
9.
This can be done manually, with or without the use of tapes or cords; or by means of sewing machine.
可以用手工,加带或绳,一起缝接;或用锁线式缝接。
10.
In particular only a successive programme of injection of the vertical joints renders the work monolith in respect of the succeeding masses and stages
特别是,对后期坝体与以后施工阶段而言只有垂直接缝的分期灌桨程序,才能给与工程以整体性。
11.
Temperature Cracks Control of Mass Concrete Construction;
水工大体积混凝土温度裂缝施工控制
12.
Problem and Prevention of Cracks in Concrete Construction
混凝土工程施工中的裂缝问题与防治
13.
Cracks and leaks are signs of poor construction in a house.
裂缝和漏水表明房子的施工质量不好。
14.
Summary on 180 dia seamless open caisson construction technologies at Baotou Steel
包钢φ180无缝旋流沉淀池施工技术总结
15.
Study on Effects of Construction Proccess and Crack Inducor at the Upstream Base of High Arch Dam;
施工过程及底缝对高拱坝的影响研究
16.
The Crack Control Study of the Mass Concrete Foundation Construction;
大体积混凝土基础施工裂缝控制研究
17.
Discussing the Crack Question in Mass Concrete Construction;
大体积混凝土施工中裂缝问题的探讨
18.
Cause analysis and treatment on crack of a light-industry factory building;
某轻工厂房裂缝成因分析及处理措施