1.
Study of the Assessment for Existing Highway Concrete Beam Bridge;
既有公路混凝土梁桥状态评估方法研究
2.
Features of the Seismic Damage to Existing Beam and Arch Bridges and Their Reinforcement Measures
既有公路梁、拱桥震害特征分析及加固对策
3.
Deformation Test and Working Mechanism Research of Pipe-roof in Double-arch Tunnel under the Existing Highway;
既有公路下连拱隧道管棚变形测试与作用机理研究
4.
Residue Fatigue Life Evaluation and Fatigue Reliability Analysis of Existing Steel Highway Bridge;
既有公路钢桥剩余疲劳寿命评估及疲劳可靠性研究
5.
Damage Evaluation and Reliability Assessment of Existing Concrete Beam Bridge
既有公路混凝土梁式桥损伤评估与可靠性评定研究
6.
Construction Management of New Highway Running Across Existing Highway
新建高速公路跨既有高速公路施工管理
7.
Fitting Technology of Existing Expressway Longitudinal Section Alignment
既有高速公路纵断面线形的拟合技术
8.
Time-Dependent Reliability Analysis of Existing RC Highway Bridges;
既有钢筋混凝土公路桥梁的动态可靠度分析
9.
Public Transportation Network Optimization Technology Based on Existent Urban Roads
基于城市既有道路的公交线网优化技术方法
10.
a very backward part of the country, with no proper roads and no electricity
这个国家中极其落后的地区, 既没有像样的公路也没有电力供应
11.
Construction was as much a drainage project as a road building effort. An average13 culverts per mile were used, totalling105 miles of pipe.
这既是筑路也是一项排水工程。平均每1公里公路有8条涵洞管道,管道总长168公里。
12.
We shall not act either justly or wisely if we attack established interests as public enemies.
视所有既得利益集团为公敌既不公正亦不明智。
13.
Effects of Introducing High Speed Railway into Existing Railway Terminal
高速铁路对既有铁路枢纽的影响分析
14.
In this paper, the tunnels construction adjacent to existing pile foundation is studied.
在公路下的软弱地层中修建靠近既有桩基的隧洞,是具有难度的近接施工工程问题。
15.
Many department stores have both elevators and escalators.
许多百货公司既有电梯又有自动扶梯。
16.
Renovation of Dangerous Bridges on the Local Narrow Track Railway
既有窄轨地方铁路危桥整治方案研究
17.
Study of the Assessment for Existing Railway Concrete Bridges;
既有铁路混凝土桥状态评定方法研究
18.
The Running Suburban Passenger Cars Scheme Investigation in the Existing Railway;
利用既有铁路开行市郊客车方案研究