说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 小型土坝
1.
The Failure Mechanism and Remedial Methods of Small-sized Earth Dam in Southern Region of China
南方小型土坝破坏机理与维护方法分析
2.
Research on the Numerical Simulation and Application of Medium and Small Earth Dam;
中小型土石坝渗流的数值模拟及其应用研究
3.
Fuzzy Comprehensive Evaluation of Earth-rockfill Dam Safety of Medium and Small-sized Reservoir;
中小型水库土石坝安全度的模糊综合评价
4.
Analysis and Anti-seepage Treatment of Leakage of Small and Medium-sized Defective Reservoir in Hubei Province
湖北省中小型水库土石坝渗漏原因及防渗处理
5.
Analysis of earth-rock dam danger for small reservoirs in Zhejiang and its countermeasures
浙江省小型水库土石坝病险分析及对策
6.
The Impact on Seepagefield and Stressfield of the Middle and Small Earth-Rock Dam by Sedimentation
泥沙淤积对中小型土石坝渗流场与应力场的影响
7.
Joint structure model test of asphalt concrete core of embankment dams
土石坝沥青混凝土心墙接头模型试验
8.
Fill Material Test Technique and Prototype Observation for High Earth and Rockfill Dam in Mexico
墨西哥高土石坝坝料试验技术和原型观测
9.
Fill Material Test Technique and Prototype Observation for High Earth and Rockfill Dam in Mexico(Part Ⅱ)
墨西哥高土石坝坝料试验技术和原型观测(续)
10.
A Mathematical Model and A Numerical Calculation Method for the Distribution State of Moisture Content in Earth Dams
土坝坝体水分分布状态的数学模型和计算方法
11.
The Primary Study of Concrete Gravity Dam Type Comparison in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Jike dam site
西线一期工程混凝土重力坝坝型比较初步研究——以纪柯坝址为例
12.
The Study of Dam Type Comparison Between Concrete Arch Dam and Concrete Faced Rock-Filled Dam in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Reba dam site
西线一期工程混凝土拱坝与混凝土面板堆石坝坝型比较研究——以热巴坝址为例
13.
The Study of Dam Type Comparison between Concrete Faced Rock-Filled Dam and Embankment Dam with a Clay Core in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Zhaluo dam site
西线一期工程混凝土面板坝与黏土心墙坝坝型比较研究——以扎洛坝址为例
14.
APPLICATION OF LEAST SQUARE METHOD TO SETTLEMENT ANALYSIS OF EARTH AFD ROCKFILL DAM
最小二乘法在土石坝沉陷分析中应用
15.
Study on the Properties of Concrete for Arch Dam of Xiaowan Hydropower Station
小湾水电站双曲拱坝混凝土性能研究
16.
A small leakage through an earth fill or hydraulic fill dam or its foundation removes some fine material in suspension.
贯穿填土坝、水力冲填坝或坝基的一个细小的漏水孔隙以悬浮的方式带走一些细小的土粒。
17.
Studies on Random Aggregate Model and Damage Model of Dam Concrete;
大坝混凝土随机骨料及损伤模型研究
18.
Method of Dam Deformaiton Analysis Based on ARMA Mixed Regression Model
基于ARMA混合回归模型的土坝变形分析