说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 不拆引线试验
1.
Dielectric loss and capacitance test on 220kV and above MOA
220kV及以上金属氧化物避雷器不拆引线试验
2.
The DC test method of zinc oxide lightning arrester without dismantling lead wire in Yinchuan East 750kV Substation
银川东750kV变电站避雷器不拆引线直流试验方法
3.
Method for Testing 220 kV MOA without Removing the HV Lead Conductor
220kV金属氧化物避雷器不拆高压引线的试验方法
4.
A New Test Method for 220 kV MOA without Disconnecting High Tension Leads
一种新的220kV MOA不拆高压引线的试验方法
5.
On-site Electric Parameter Measurement of 500kV Zinc Oxide Arrester without HV Lead Dismantled
现场不拆引线测试500kV氧化锌避雷器电气参数
6.
Testing of Capacitor Voltage Transformer and Arrester without Removal of the Lead
500kV电容式电压互感器、避雷器不拆线试验方法
7.
Additional Error Analysis of 500kV CVT Dielectric Loss testing in Non-Open Wire case
不拆线测试500kV CVT介损的附加误差分析
8.
The Experimental Study and Non-Linear Fem Analysis of Thin Shear Wall Without Demoulding of Reinforced Concrete;
免拆模薄壁剪力墙抗震性能试验研究及非线性有限元分析
9.
Disconnect distributor wiring harness from main engine harness.
从主引擎线束上拆下分电盘线束。
10.
Experimental study on open room soil and impaction compaction method for poor weak subgrade treatment
拆房土+冲击碾压法处理软弱不良路基的试验研究
11.
Disconnect test leads from relay cavities immediately after testing.
测试后立即从继电器上拆卸测试导线。
12.
The calibration of a closed throat will not suffice if the walls are removed to make an open throat.
如拆走洞壁形成一个开口试验段,则闭口试验段用的校测结果就不够充分了。
13.
Hydraulic Test Study on Access Tunnel A-AN
南水北调西线阿安引水隧洞水力学试验研究
14.
The Application of FCS on a Traction-Motor Testing System
现场总线控制系统在牵引电机试验台的应用
15.
The Application of Field-bus Control System in the Traction Motor Testing Device;
现场总线控制系统在牵引电机试验台的作用
16.
Research on the Short-circuit Test of Traction Power System on the Passenger Dedicated Line
客运专线牵引供电系统短路试验的研究
17.
Fuze Safety Distance Testing Method Based on Electromagnetic Induction of Coil Target
基于电磁感应的线圈靶引信保险距离试验方法
18.
Research on the Control Strategy of the Reciprocal Power-fed Test Rig for Linear Induction Motor
直线感应电机牵引互馈试验台控制策略研究