说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 青松水电站
1.
Study on the Hydraulic Model Test of Head Pivot of Qingsong Hydropower Station
青松水电站首部枢纽水工模型试验研究
2.
Analysis on the Dam Bypass Seepage on Right-bank in the Dam Site of Songta Hydropower Station
松塔水电站坝址区右岸绕坝渗漏分析
3.
Construction Scheme of Subsequent Project of Cascade Hydropower Station in Songjianghe;
松江河梯级水电站后续工程建设方案探讨
4.
Stability Study to 2# Ripping Loose Rock Mass Slope of Yagen Hydropower Station
牙根水电站2号拉裂松动岩体边坡稳定性研究
5.
Study on new technology of asphalt concrete core wall in Yele Hydropower Station
冶勒水电站沥青混凝土心墙施工新工艺研究
6.
Quality Control for Construction of Asphalt Concrete Facing Works at Upper Reservoir of Xilongchi;
西龙池电站上水库沥青混凝土施工质量控制
7.
floating power barge
水上动力站水上发电站
8.
Study on Relief of Excavation Slope of Fossil Weathered Rock and Anchor Measure of Gongboxia Hydroelectric Powerstation;
公伯峡水电站古风化岩边坡开挖松驰与锚固措施研究
9.
Analyzing Development Characteristics Causes to 1~# Ripping Loose Rock Mass of Yagen Hydropower Station
牙根水电站右岸1号拉裂松动岩体发育特征及成因分析
10.
The Application of Mechanical Parameters Estimation of Rock Mass in the Dam Site of Songta Power Station in Nujiang River
岩体力学参数估算方法在怒江松塔水电站坝址区的应用
11.
EXPERIMENTAL STUDY FOR UNLOADING AND RELAXATION OF DAM BASE DURING EXCAVATION AT XIAOWAN HYDROPOWER STATION
小湾水电站低高程坝基开挖卸荷松弛机理试验研究
12.
Model Test and Investigation on Draft Tube Mid-pier Modification of the Qingtong-Gorge Hydropower Station;
青铜峡水电站尾水管中墩改造结构模型试验与计算研究
13.
Bituminous Concrete Construction Technology of Upper Reservoir of Zhanghewan Pumped-storage Power Station
张河湾抽水蓄能电站上水库沥青混凝土施工技术
14.
hydroelectric(power) statio
水(力发)电厂[站]
15.
Study on Impervious Core Wall Structure of Rockfill Dam for Water Power Station at the Sandao White River
三道白河水电站沥青心墙堆石坝防渗结构研究与分析
16.
Quality Control for Embankment of Rockfill Dam with Asphalt Concrete Core at Yele Hydropower Station
冶勒水电站沥青混凝土心墙堆石坝填筑质量控制
17.
Experimental research on asphalt concrete impervious core wall for Yele hydropower station
冶勒水电站沥青混凝土心墙防渗性能的试验研究
18.
Quality control and management of asphalt concrete core wall in the dam for the Yele Hydropower Station
冶勒水电站大坝沥青混凝土心墙质量控制与管理