说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 施工沉降
1.
Construction Techniques for the Control of the Settlement in Urban Shallow Tunnels
城市浅埋暗挖隧道施工沉降控制技术
2.
Studies on Controlling Technology of Ground Subsidence Induced by Shallow Tunnel Construction Method in Urban Environments;
城市浅埋暗挖法施工沉降控制技术研究
3.
Construction Technology of Subway Station with PBA Method and Settlement Analysis
地铁车站PBA工法施工技术及沉降分析
4.
Study of Land Subsidence Induced by Construction of Urban Metro Tunnels for Mutil-Tunnel System;
城市地铁群洞隧道施工地表沉降研究
5.
Research on Rapid Construction and Settlement Control of High Filled Subgrade;
高填方路基快速施工与沉降控制研究
6.
The Applying of the Settling Observing Technology in the High-rise Construction;
高层建筑施工中沉降观测技术的应用
7.
The Sinking Survey of Construction of Meizhou Yinyu Mansion;
高层(大型)建筑物施工的沉降观测
8.
Study on Influence of Drainage for Open Caisson's Construction on Levee Security of Yangtse River
沉井施工降水对江堤安全影响的研究
9.
Settlement reservation control in construction of a deepwater breakwater
某深水防波堤施工中的预留沉降控制
10.
Elementary Discussion on Deep Well Dewatering in Construction of Open Caisson by "Drainage Sinking Method"
浅谈“排水下沉法”沉井施工中的深井降水
11.
Study on Ground Subsidence Due to Construction of Metro Tunnel with Un-Pumping Construction Method;
地铁隧道非降水法施工引起的地表沉降的研究
12.
Measures of controlling directional non-excavating construction crossing building settlement
控制定向非开挖施工穿越建筑物沉降的措施
13.
Settlement Control Measures During Jacking Construction of Box Culvert in Zhengzhou Area
郑州地区顶进箱涵施工中沉降变形控制措施
14.
This construction control mode is beneficial to the settlements control in each step.
建立的分步控制沉降的施工控制模式,有利于控制每一步序沉降值;
15.
Study on Ground Settlement Due to Subway Construction with Cavern-Pile and CRD Method;
洞桩法及CRD工法地铁施工对地表沉降影响研究
16.
The deep base pit guards against the technology measure bordering building settlement in precipitation construction
深基坑降水施工中防止相邻建筑沉降的技术措施
17.
Research into the Control of Roadbed Sink on Soft Ground in the Construction of Expressway
软土地基高速公路施工期间沉降监测研究
18.
Analysis of Ground Surface Settlement Due to the Tunnel Construction with EPB Shield
土压平衡盾构施工引起的地表沉降分析