1.
Application of AutoCAD Second Development to the Pipeline Mapping Drawings
AutoCAD二次开发在绘制管线竣工图中的应用
2.
The Technology and Management of Pipeline Surveying of Completed Project in Guangzhou University Town
广州大学城管线竣工测量的技术与管理
3.
Acceptance appraisal on water-soil conservation works along Yizheng-Changlin crude oil pipeline
仪征-长岭原油管道沿线水土保持竣工验收评估
4.
THE DISCUSSION ABOUT THE FINANCIAL ACCOUNTING MANAGEMENT AFTER THE COMPLETION OF THE PROJECT;
浅议工程项目竣工后的财务会计管理
5.
Improve Construction Contract Management to Control Settlement Cost
加强施工合同管理 控制竣工结算造价
6.
Although the Chrysler building was completed before the ESB,
尽管莱斯勒大楼比帝国大厦提前竣工,
7.
Discussion of Digitization and Database Creation for Electricity Pipeline--Storing Data by Data Interchange Format
小议电力管线竣工数据数字化采集入库过程——通过交换格式实现数据入库
8.
Examination and approval of completion settlement for expansion and second-time interior decoration projects of library;
图书馆扩建及二次内装饰工程的竣工结算审核
9.
Final archives management of Shuibuya Hydropower Project;
水布垭水电站工程竣工档案的管理工作
10.
On Refined Management and Settlement for Completion of Work in Coal Construction Enterprise
浅谈煤炭施工企业精细化管理与工程竣工结算
11.
Establishment of Power Completion Work Chart Index Using AutoCAD Secondary Development technology
利用AutoCAD二次开发技术建立电力竣工图索引
12.
Strengthening management of the completion data and improving the management level of the capital construction archives;
加强竣工资料管理 提升基建档案管理水平
13.
Doing a Good J ob of Management of Completed Project Document According to Interna-tional Practice;
与国际惯例接轨 做好项目竣工文件管理工作
14.
Discussion on the building completion measurement of urban standard management
城市规划管理中的建筑物竣工测量探讨
15.
THE MANAGEMENT OF THE ENGINEERING PROJECTS FILES IN JINDUICHENG MOLYBDENUM GROUP CO.,LTD;
浅谈金堆城钼业集团工程项目竣工档案管理工作
16.
The acceptance of engineering structures mentioned in the preceding paragraph upon completion should be taken part in by the water conservancy administrative department.
前款规定的工程设施竣工验收时,应当有水行政主管部门参加。
17.
Study on Supervisory Management System of Urban Planning Approved Construction Complete Projects;
城市规划审批建筑工程竣工验收项目监督管理系统研究
18.
attends a ceremony marking the completion of an extra high-voltage transformer substation for the Tainan Science-based Industrial Park and the connection of the power lines.
参加「台南科学园区超高压电变电所暨输电线竣工典礼」