说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 盾构井
1.
Calculation and Application of Reinforcement of Ground near Shield Launching/arriving Shaft in Sand Strata
砂层地带盾构井端头加固计算与应用
2.
APPLICATION OF TOP-DOWN CONSTRUCTION METHOD IN CONSTRUCTION OF SHIELD SHAFT LINING STRUCTURE
逆作法在盾构井内衬结构施工中的应用
3.
The Application of New Austrian Tunneling Method on the shaft for shield tunnel
新奥法在盾构竖井中的施工技术应用
4.
Application of Fiberglass Reinforcement in Exterior-protected Structure of Shield End Shaft
玻璃纤维筋在盾构端头井围护结构中的应用
5.
Top-Down Construction Technique for Excavation of Working Shaft Cover of TSM in Shanghai Subway Station
上海地铁车站盾构工作井盖挖逆作施工技术
6.
Research and Application of Top Down Construction in Vertical Shaft Structures of Shield Tunnels
逆作法施工技术在盾构竖井施工中的应用
7.
Study on the Construction Technology of Shield Launching Shaft of Urban Metro in Narrow Field
城市地铁狭小场地盾构始发井施工技术研究
8.
On the supplementary measures and strengthening scheme of shield end well of a station in Nanjing city
南京某车站盾构端头井加固方案及辅助措施
9.
Design and Construction of Shield Rehabilitation Shaft under Complex Environment
复杂条件下盾构改造竖井的设计与施工
10.
Construction Technology for Large Diameter Slurry Shield TBM Closely undercrossing Ventilation Shaft
大直径泥水平衡盾构近距离穿越风井施工技术
11.
The shield original well excavation construction technology in a subway station of Guangzhou
广州某地铁车站盾构始发井开挖施工技术
12.
The soft soil shield driving top wall bottom pit reinforce stability number analysis
软土盾构端头井基坑加固稳定性数值分析
13.
Study on the Application of GFRP in Fender Piles in Shield Shaft;
玻璃纤维(GFRP)筋在盾构端头井围护桩中的应用研究
14.
Application of High-pressure Spiral Jet Grouting Piles in Shield Tunnel Portal Soil Reinforcement Engineering
旋喷桩在盾构法隧道端头井洞口土体加固工程中的应用
15.
Technology of Top-down Construction of Concrete Lining of Shield Launching Shaft of Yellow River Crossing Tunnel Project
穿黄工程盾构始发井内衬混凝土逆作法施工技术
16.
Horizontal Grouting Reinforcement Technology of Shield End Well in Hongxing Road Station of Tianjin Metro
天津地铁红星路站盾构端头井水平注浆加固技术
17.
Numerical Simulation Analysis on Shaft Support Natural Gas Pipeline Shield-Crossing the Changjiang River
天然气管道盾构穿越长江竖井支护数值模拟分析
18.
Technological Research and Discussion on Erection of Metro Tunnel Boring Machine Up and Down in Shaft Well
地铁隧道盾构掘进机上、下井吊装工艺的研究与探讨