说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 复线施工
1.
On application of blasting control of interference stonework in existing wires of double line project
既有线干扰石方控制爆破在复线施工中的应用
2.
The Application of RTK-GPS in Repetition Measurement in Transmission Line Construction
RTK-GPS在送电施工复测线路中的应用
3.
Construction and Stress Control of Pre-bent Compound Beam of Over-railway Bridge of Anshan Steel Factory
鞍钢铁路跨线桥预弯复合梁的施工与应力控制
4.
Effect of Blasting in Double Line Tunnel on Existing Tunnel
复线隧道施工爆破对既有隧道结构的影响分析
5.
Construction Technology of Bridge Jacking of Railway Curve Segment Under Complex Surrounding
复杂环境下铁路曲线段顶进桥涵施工技术
6.
Study of Construction Technology of the Portal of New Maomaoying Tunnel on the Second Zhuzhou-Liupanshui Railway Line;
株(洲)—六(盘水)复线新猫猫营隧道洞口施工技术研究
7.
Study on the Administration System Innovation of the Temporary Land Reclamation in South-to-north Water Diversion Project at Shandong
南水北调东线工程山东段临时用地复垦实施管理制度创新研究
8.
Influencing factors and improvement measures to machining precision and surface quality in high-speed WEDM
高速往复走丝线切割加工精度和表面质量的影响因素及改进措施
9.
Construction of Dragging Pipe under Complex Condition of Non-excavation
复杂施工条件下非开挖拖拉管的施工
10.
no immediate resumption of building work
建筑施工没有立即恢复
11.
Interdictum de opere restituendo
将施工恢复原状之令状
12.
This paper introduces the controlled blasting techinque for stonework and preventive technique for existing lines in construction of depressed road's extension of double line railway.
本文介绍了铁路复线扩堑施工中的石方控制爆破技术及对既有线的安全防护技术。
13.
Analysis and measures on machining difficulty processing materials and complicated workpiece in wire electrical-discharge machining
电火花线切割加工中难加工材料及复杂件常见问题分析及应对措施
14.
Construction design of composite foundation of CFG piles and key points for construction management
CFG桩复合地基施工设计及施工工程管理要点
15.
Construction Technology Investigation of Subgrade Engineering for Special Railway Passenger Transport Line;
铁路客运专线路基工程施工工艺研究
16.
The Three Gorges double-way and five-step shiplock is a massive civil and electromechanical works, dealing with constraining factors such as sophisticated technologies, tight time schedule, etc.
三峡双线五级船闸是一个超大型土建施工和机电安装项目,涉及技术复杂、期紧等制约因素。
17.
The Research of Tunneling-induced Effect on Adjacent Existing Tunnel and Buried Pipelines and Deformation Control of These Adjacent Utilities;
复杂环境下隧道施工对邻近地铁隧道及地下管线的影响及变形控制分析
18.
Technical specification for construction of cross power transmission line in installing the conductor
跨越电力线路架线施工规程