说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 1000MW超超临界锅炉
1.
Modeling and Simulation of 1000MW Ultra Supercritical Boiler Based on MATLAB
基于MATLAB的1000MW超超临界锅炉建模与仿真
2.
The Currently Main Technical Characters of 1000MW Ultra-supercritical Boiler
当前1000MW超超临界锅炉的主要技术特点
3.
Technological Features and Experimental Researches for Dongfang's 1000 MW Ultra-supercritical Boiler
东方1000MW超超临界锅炉技术特点及性能
4.
Introduction to simulation computing program of startup characteristic for 1000 MW ultra supercritical boiler
1000MW超超临界锅炉启动特性模拟计算程序
5.
Hoisting and Installation of Top Girder in 1000 MW Super-critical Unit Boiler
1000MW超超临界机组锅炉顶板梁吊装
6.
On the Steam-blowing of 1 000 MW Supercritical Boiler
超超临界1000MW机组锅炉蒸汽吹管
7.
1000MW Ultra-supercritical Towered Boilers' Characteristic and Debug Technology
1000MW超超临界塔式锅炉特点及调试技术
8.
Study of the Aerodynamic Field in a 1000MW Lignite-Fired Ultra Supercritical Boiler
1000MW超超临界褐煤锅炉冷态空气动力场试验研究
9.
Disquisition on Burning Questions of Ultra-super Critical Coal-fired 1000MW Boiler of Yuhuan Power Plant
玉环电厂超超临界1000MW锅炉燃烧问题研究
10.
EDTA ammonium salt cleaning of new built 1000 MW ultra super critical once-through boiler
新建1000MW超超临界直流锅炉的EDTA铵盐清洗
11.
COMMISSIONING AND OPERATION OF 1000 MW ULTRA-SUPERCRITICAL ONCE-THROUGH BOILERS
超超临界1000MW机组直流锅炉的调试及运行
12.
CAUSE ANALYSIS OF SLAGGING IN BOILERS FOR 1000 MW ULTRA-SUPERCRITICAL UNITS AND COUNTERMEASURES THEREOF
超超临界1000MW机组锅炉结焦原因分析及对策
13.
Lifting Technique for Boiler Girder of 1000MW Supercritical Coal-fired Unit
1000MW超超临界燃煤机组锅炉大板梁吊装技术
14.
Start-up and Commissioning On 1000MW Ultra-supercritical Once-through Boiler
1000MW超超临界直流锅炉启动调试试验研究
15.
Numerical Simulation of NO Emission of a Dual Circle Tangential Firing Boiler of a 1000 MW Ultra Supercritical Unit
1000MW超超临界机组双切圆锅炉NO排放特性的数值模拟
16.
Water-level Control of Water Separator during Startup of Domestic 1000 MW Ultra Supercritical Pressure Once-through Boiler
国产1000MW超超临界压力直流锅炉启动过程中汽水分离器水位的控制
17.
Analysis of the control strategy of the middle point temperature of two types of ultra super-critical 1000MW DC boiler and the effect
两类超超临界1000MW直流锅炉中间点温度控制策略和效果分析
18.
Research on On-line Temperature Monitoring of Heating Surface of 1000MW Ultra-supercritical Tower Type Boiler
1000MW超超临界塔式锅炉受热面壁温在线监测方法研究