1.
Application of HR3C Welding Technology in 1 000 MW USC Units
百万千瓦机组HR3C焊接技术的应用
2.
Discussion on the Reduction of the Station Service Power Consumption Rate for 1000MW Power Generation Unit
百万千瓦机组降低厂用电率的方案探讨
3.
1 000 MW ESC Unit Roofing Beam Hoisting Construction
超超临界百万千瓦机组顶板梁吊装施工方案
4.
Optimization of 1000 MW Unit Tower-type Boiler Heating Surface Hoisting Scheme
百万千瓦机组塔式锅炉受热面吊装方案的优化
5.
Construction Scheme of Once-Through Boiler Burner for Mega-Kilowatt USC Units
超超临界百万千瓦机组直流炉燃烧器施工方案
6.
APPLICATION OF ADVANCED WATER TREATMENT TECHNOLOGY IN MAKE-UP WATER ON CIRCULATING &COOLING WATER
中水深度处理技术在百万千瓦机组循环水补水中的应用
7.
Application of Infrared Imaging in Electric Equipment Inspection of Mega-kilowatt Units
红外成像技术在百万千瓦机组电气设备检测中的应用
8.
MW-Class Nuclear Power Turbine Features and Its Model Selection Principles
百万千瓦级核电机组汽轮机的特点及选型原则
9.
TYPE SELECTION OF TURBINES' BY-PASS SYSTEM FOR ULTRA-SUPERCRITICAL UNITS WITH 1000 MW CAPACITY IN CHINA
国内超超临界百万千瓦等级机组汽轮机旁路系统选型
10.
Technical and Economical Analysis of the 300,000 Kilowatt Generating Set Built by China and the 350,000 Kilowatt Mitsubishi Generating Set
国产30万千瓦机组与三菱35万千瓦机组技术经济分析
11.
Analysis of the LP Flow Field of Siemens’ 1000MW Ultra-SuperCritical Steam Turbine
引进型百万千瓦超超临界汽轮机低压流场分析
12.
To ensure the fulfillment of above goal, at least 2-3 units of 1000MW NPPs have to start construction each year from now on.
为确保完成这一目标,从现在起至少每年需要开工2--3台百万千瓦的核电机组。
13.
The installed capacity of electricity it has invested in and developed globally has reached 15 million kilowatts.
它在全世界投资发展的电力装机容量已达一千五百万千瓦。
14.
Fault diagnosis for the million-kilowatt-class nuclear power turbo-generator based on compensatory fuzzy neural network
基于补偿模糊神经网络的核电百万千瓦级汽轮发电机的故障诊断
15.
Integral Assembly Technology of HP Casing for Ultra Supercritical 1000MW Steam Turbines
百万千瓦超超临界汽轮机高压缸整体总装工艺技术
16.
Comparison of 2 Sealing Oil Systems for Hydrogen-cooled Generator of Domestic 1000MW Nuclear Power Stations
国内百万千瓦核电站氢冷发电机2种密封油系统的比较
17.
Calculation and Theoretical Analysis of Flexible Damping Support for Simulated Machine Group of 600 MW Turbogenerator
60万千瓦汽轮发电机模拟机组弹性阻尼支承理论分析及计算
18.
2) If the turbine-generator sets are arranged in two lines the dam may be shortened 330m long or may install still more 13 turbine-generator sets may be installed and will increase 6.5 MKW of capacity.
三峡电厂机组应该排成双列,可以使大坝缩短330米; 或者可多装650万千瓦的机组。