说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 二期坝
1.
Phase Ⅱ materiais of cushion layer for dam hody and construction measurement control of slope of Wuluwati Facing Slab Dam
乌鲁瓦提面板堆石坝二期坝体垫层料及坡面施工测量控制
2.
Problems and their solutions of Phase-Ⅱ tailings dam in Miaogou Iron Ore Mine
庙沟铁矿二期尾矿库坝体存在问题及治理
3.
Comparison of Second Stage Artificial Cooling Schemes in Xiaowan Arch Dam
小湾拱坝二期冷却方案温控措施对比分析
4.
According to presentations, the second phase project of the Three Gorges Project mainly includes bids such as the flood discharge dam, the factory protection dam and the factory buildings, etc.
据介绍,三峡工程二期工程主要包括泄洪大坝、厂房大坝及厂房等标段。
5.
Study on the Temperature Field of Ertan Arch Dam in the First Impounding Period and Its Effect on the Structure of the Dam;
二滩水电站初期蓄水拱坝温度场及对大坝结构特性作用与影响研究
6.
Research on the Compensation of Concrete Crevice Treatment on the Upper & Down Stream Dam Surface of the Three Gorges Project;
三峡二期工程大坝上下游面混凝土裂缝处理变更补偿问题探析
7.
Temperature Control and Anti-crack Technique in the Construction of LOT II A of the Left Bank Plant Section of the Secondary Phase of the Three Gorges Project
三峡二期工程左岸厂房坝段ⅡA标段混凝土温控及防裂技术
8.
Cause Analysis of Cracking in Dam Body during the Construction of Bailianya Dam
白莲崖大坝施工期坝体裂缝成因分析
9.
BUILDING THE RESIDUE DISPOSAL DAM WITH DIRECTIONAL-THROW BLASTING FOR THE SECOND POWER PLANT OF MOU DAN JIANG
牡丹江二电厂贮灰坝定向抛掷爆破筑坝
10.
Seepage-proof Strengthening Optimization Research of No.2 Auxiliary Dam of Xiangtan Power Plant
湘潭电厂二号副坝坝体防渗加固优化研究
11.
TWO-STAGE ANALYSIS OF INITIAL GEOSTRESS FIELD AT DAM SITE ZONE OF HIGH ARCH DAM
高拱坝坝址区初始地应力场的二次计算
12.
The Primary Study of Concrete Gravity Dam Type Comparison in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Jike dam site
西线一期工程混凝土重力坝坝型比较初步研究——以纪柯坝址为例
13.
Data analysis on impervious wall under construction of Renzonghai hydropower station
仁宗海水库大坝坝基防渗墙在坝体填筑期间的监测资料分析
14.
Dam Body Filling Design by Stages for Concrete Face Rock-fill Dam of Hongjiadu Hydropower Station
洪家渡水电站面板堆石坝坝体填筑分期设计
15.
Dam reliability analysis during Periodic inspection on dam safety
大坝安全定期检查时的坝工可靠度分析
16.
Non-linear Finite Element Analysis for the Overflow CFRD in Construction Period
施工期坝面过水面板堆石坝非线性有限元分析
17.
Study on temperature-stress simulation of RCC dam during construction period
碾压混凝土坝施工期坝体温度及应力仿真研究
18.
The Study of Dam Type Comparison Between Concrete Faced Rock-Filled Dam and Embankment Dam with an Asphaltic Concrete Core in first Stage of the Western Route Water-Transfer Project--Dam type comparison at Renda dam site
西线一期工程混凝土面板坝与沥青心墙坝坝型比较研究——以仁达坝址为例