1.
Seismic Performance Analysis of a Continuous Girder Bridge with Precast Segmental Bridge Columns Using Match-cast Dry Joints
干接缝节段拼装桥墩连续梁桥地震反应分析
2.
Seismic Analytical Model of Segmental Bridge Column with Match-cast Epoxy Joints
胶接缝连接的节段拼装桥墩抗震分析模型
3.
Cyclic Tests Study and Nonlinear Finite Element Analysis on Seismic Behavior of Prestressed Precast Segmental Bridge Piers;
节段拼装预应力混凝土桥墩拟静力试验和分析研究
4.
Recall & Development and Outlook of the Railway Bridge Segments Assembled Machine
铁路桥梁节段拼装造桥机回顾、发展与展望
5.
Alignment Control for Short-line Precast Segmental Bridges
短线法节段预制拼装桥梁线形控制探讨
6.
Construction technology of box-girder segment bricolage of traversing carriage bridge fabrication machine
移动支架造桥机箱梁节段拼装施工技术
7.
Cable installation for reinforced concrete box arch bridge of Liuguihe large Bridge
六圭河大桥钢筋混凝土箱形拱桥多节段缆索吊拼装施工技术
8.
Researching Manufacture of Newly Prefabricated Box Beam Segment Bridge Erector and Technology of Assembly Quality Control
新型预制箱梁节段架桥机的研制及拼装质量控制技术
9.
Research and Application of Cantilever Assembly Equipment to Prefabricated Segmental Box Girder of Shanghai Yangtze River Tunnel-Bridge Section B6
上海长江隧桥B6标预制节段箱梁悬臂拼装设备研究与应用
10.
Study on Construction Technology for Pre-fabricated Segmental Box Girder Cantilever Erection in Shanghai Yangtze River Tunnel-Bridge Section B6
上海长江隧桥B6标预制节段箱梁悬臂拼装施工技术研究
11.
Large sections of bridge deck are pushed out over the piers on rollers or sliding teflon bearings.
将桥面的巨大节段在滚轴或聚四氟乙烯支撑板上推过桥墩。
12.
Review of Segmental Assembling Construction Technique of Mobile Support
移动支架节段拼装施工技术方法综述
13.
Method and technique of segmental prefabrication, transfer gantry hoisting, splicing on arch timbering in construction of Xinyang Shihe River Bridge are introduced.
介绍信阳狮河大桥采用节段预制,龙门桁车提运,拱架上拼装等施工方法和施工工艺。
14.
Technology Research for Steel Box Girder Fabrication and Preassembly of E Dong Yangtze River Bridge
鄂东大桥钢箱梁梁段制造及预拼装技术研究
15.
Totaling 216 piers of the bridge completed installation in the deepwater area in the Yangtze River on Saturday.
当日,上海长江大桥深水区216节墩柱全部预制安装完成。
16.
Comprehensive Application of Construction Techniques for Segmental Precasting and Cantilever Assembling to Bridge Works
节段预制、悬臂拼装工艺在工程中的综合运用
17.
On Box Girder Precast Segment Assembling by Short-line Method & Alignment Control Technological Principle
短线法箱梁节段预制拼装及线形控制技术原理
18.
Fabrication Technique and 3D Shape Simulation for Integral Pre-assembly of Steel Tower Segments in Nanjing 3rd Yangtze River Bridge;
南京长江三桥钢塔节段制造及整体预拼的三维仿形分析