1.
On the Drainage Construction Technique of Intensive Permeable Foundation Pit of Cuijiaying Navigation and Power Generation Project
崔家营航电枢纽工程强渗水基坑排水施工技术
2.
Post-Evaluation Study on Navigation Economic Benefit of the River Navigation and Hydropower Junction
内河航电枢纽工程航运经济效益后评价研究
3.
Analysis of ice slush in construction period of Dadingzishan navigation power complex
大顶子山航电枢纽工程施工期冰凌问题分析
4.
The Research on the Risk Management in the Period of Decision-making of Waterway Navigation & Hydropower Junction Project;
航电枢纽工程项目决策阶段风险管理研究
5.
A Post-assessment of Sustainable Development of Resettlement Project of Zhuzhou Hydropower Junction Project;
株洲航电枢纽工程移民项目可持续性后评价
6.
Contract Variation and Claim Management of Zhuzhou Navigation-Power Junction s Lock Project;
株洲航电枢纽船闸工程合同变更与索赔管理
7.
Experimental Study on the Dispersity of Soil in Shihutang Navigation-Power Junction Project
石虎塘航电枢纽工程土料分散性鉴定试验研究
8.
Discussion on calculation of economic benefits for inland navigation and electricity junction
内河航电枢纽工程航运经济效益的量化计算探讨
9.
Test Study on Flow Conditions at Water Intake of Power Station at Shihutang Navigation-power Junction
石虎塘航电枢纽工程电站取水口水流条件试验研究
10.
Phase I damming engineering for the workshop and desilting sluice of Jialing river caojie navigation-power junction
嘉陵江草街航电枢纽厂房及冲沙闸工程一期截流施工
11.
Study of navigation flow condition for Xiafu Hydraulic Complex
下福水利枢纽工程通航水流条件研究
12.
Geological Characteristics of Fault F_1 in Baima Navigation-power Junction Dam Area and Analysis of Its Influence to the Project
白马航电枢纽坝址区F_1断层地质特征及对工程的影响分析
13.
The Research on Risk Management of Construction Diversion of Low-head Navigational Junction;
低水头航运枢纽工程施工导流风险管理研究
14.
Construction Supervision System During Yellow River Wanjiazhai Water Control Project;
黄河万家寨水利枢纽工程的建设监理
15.
Management of Electro-mechanical items for Xiafu Hydraulic Complex during construction period
下福水利枢纽工程建设机电项目管理
16.
On Gate Hoist Girder Construction Stent Design of Jinyintai Navigation and Hydropower Project
金银台航电枢纽闸门启闭机主梁施工支架设计
17.
Effect of River Bed Deformation on Navigation due to the 1st Stage Project of Dadingzishan Hydroelectric Scheme
大顶子山航电枢纽一期施工河床变形对通航影响
18.
Successful experiences in blasting demolition of an underwater cofferdam of Dayuandu power station is introduced briefly, which are useful for the designing other similar blasting demolition project.
介绍了大源渡航电枢纽工程河中混凝土纵向围堰上游连接段水下拆除爆破的成功经验。