说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 竣工环境保护验收
1.
Discussions on Monitoring on Environmental Protection Construction Project for Check and Accept of Completed Project
建设项目竣工环境保护验收监测工作探讨
2.
The Task and Countermeasures of Current Situation on Environmental Monitoring for Examination and Acceptance of the Newly Completed Source in Environmental Management
建设项目竣工环境保护验收监测在环境管理中的任务与对策
3.
Analysis of the EIA effectiveness for highway noise from the environmental protecting acceptance check
竣工环境保护验收调查分析公路噪声环评的有效性
4.
Review on methods of Environmental Protection Check for the Completed Hydropower Project and its application
水电工程竣工环境保护验收调查技术方法与实践
5.
Problems in Environmental Protection Check and Accept Monitoring of Project Complete
建设项目竣工环境保护验收监测存在问题的分析与建议
6.
Preparation of Investigation Program and Report of Acceptance Check in terms of Environmental Protection for Completed Construction Projects
建设项目竣工环境保护验收调查方案和报告的编制
7.
The Study on Integrative Estimate System of Competion Acceptance of Construction Projects (Pollution) on Envrionmental Protection;
建设项目(污染型)竣工环境保护验收综合评定体系研究
8.
Study on Preparing the Report of Environmental Protection Acceptance Check for Oilfield Productivity Exploitation Construction Projects;
浅谈油田产能开发建设项目竣工环境保护验收调查报告的编制
9.
Discussion of Problems on Monitoring Report Preparation for Environmental Acceptance Checking
项目竣工环境保护验收监测报告编制中若干问题的探讨
10.
Problems in Environmental Protection Acceptance of Field Monitoring for Construction Projects
建设项目竣工环境保护验收现场监测中应处理好的问题
11.
Several Points on Writing Environmental Protection and Acceptance Report of Completion of the Constructed Project
建设项目竣工环境保护验收监测报告编写的几点体会
12.
The determination of monitoring site, monitoring factors and frequency in environmental protection acceptance check monitoring for construction project were discussed.
概述了建设项目竣工环境保护验收监测点位的布设、监测因子的选择及监测频次的确定。
13.
"upon completion of the project, submit a report on inspecting and accepting the completed environmental protection facilities."
竣工后,必须报送环境保护设施竣工验收报告。
14.
within 30 days of receipt of the text on environmental protection in the preliminary design of a construction project and the report on inspecting and accepting the completed environmental protection facilities
初步设计环境保护篇章、环境保护设施竣工验收报告的三十日内
15.
(7) having the facilities to guarantee coal mine safety in production and environmental protection facilities, which have been proved up to the standard through the acceptance test conducted upon completion of the project; and
(七)有竣工验收合格的保障煤矿生产安全的设施和环境保护设施;
16.
PROJECT COMPLETION AND ACCEPTANCE OF ENVIRONMENTAL PROTECTION,MONITORING,SOME EXPERIENCE
建设项目环境保护竣工验收监测工作中的几点体会
17.
Investigation Methods for Ecological Environment Impact During Completed Acceptance of Expressways
高速公路竣工环保验收生态环境影响调查方法
18.
Completed project acceptance with regard to environmental protection and fire fighting
建设项目竣工的环保和消防验收工作