1.
Analysis of instability characteristics of surrounding rock within horizontal section caving face in steep coal seam
急斜煤层水平分段综放开采围岩失稳特征分析
2.
Study on Gob-side Entry Retaining Technical with Horizontal Section Top Coal Caving in Steep-inclined and Very Thick Seam;
急倾斜特厚煤层水平分段综放开采沿空留巷技术研究
3.
Study on Behavior of Superincumbent Strata in Mining 45 Degree Coal Seams Using Horizontal Section Top-coal Caving;
45°煤层水平分段综放开采上覆岩层移动破坏规律研究
4.
Study on Roadway Supporting Technology of Full-mechanized Sublevel-Top-Caving Mining for Steep Seam
急倾斜煤层水平分段综放开采巷道支护技术研究
5.
Study on Structure and Control of Surrounding Rock in Mining Steep Seams Using Horizontal Section Top-Coal Caving;
急斜煤层水平分段放顶煤开采围岩结构及其控制性研究
6.
Comprehensive analysis of coal break on steep and thick coal seam 102m section
急倾斜厚煤层102m阶段煤体综放开采煤体致裂综合分析
7.
Optimized Stress Distribution and Size of Coal Pillar in Fully Mechanized Coal Mining
综放开采区段煤柱应力分布及其尺寸优化设计研究
8.
Full-mechanized Caving Mining Test under Soft Sand Aquifer
松软砂岩含水层下控水综放开采试验
9.
Roof-coal Falling Characteristics Analysis in Fully-mechanized Caving
综放开采顶煤冒放性因素分析与评价
10.
flat back cut and fill method
水平分层充填开采法
11.
Research on Deformation Monitoring of Surrounding Rock in Large Section-height Full-mechanized Caving Mining Steeply Inclined Coal Seam
急倾斜煤层大段高综放开采围岩变形监测研究
12.
Distribution of Mining Fissures Induced by Fully Mechanized Caving Mining and Analysis on Their Evolvement Characteristics
综放开采采动裂隙分布及其演化特征分析
13.
Study on Development Law of Water Conducted Fracture Zone in Top Coal of Fully Mechanized Top Coal Caving Mining Face
综采放顶煤导水裂缝带发育规律分析
14.
Selection of Reasonable Section Heights During Top-coal Caving to Steep Seams
急斜煤层分段放顶煤开采合理段高选择研究
15.
Study on the Height of Water Flowing Fractured Zone and Prediction Method in Fully Mechanized Sub-Level Caving;
综放开采导水裂隙带高度及预测方法研究
16.
Numerical Simulation Research on Water-burst from Floor in Full-mechanized Caving Mining Thick Coal Seam in Deep Mine
深井厚煤层综放开采底板突水数值模拟研究
17.
Top coal caving longwall mining in high coal seams under Yuecheng Reservoir:an engineering practice
岳城水库下综放开采厚煤层的工程实践
18.
Determination of waterproof rock pillar height with the top coal caving under sea
海下综放开采防水安全煤岩柱厚度的确定