1.
Discussion on Water Inrush Mechanism of Pingshuo Antaibao No.3 Deep Mine
平朔安太堡三号井工矿突水机理初探
2.
Rapid Construction Technology of Freezing Well-wide Shaft of New Shanghai No.1 Ventilation Shaft Mine
新上海一号矿风井全井冻结井筒快速施工技术
3.
Discussion about the Influence of Miner s Human PSI to Mine Pit Safety Production;
矿工人体三节律对矿井安全生产影响程度探讨
4.
The miners were trapped after three vertical shafts were flooded.
这个铁矿的三个竖井发生透水,将矿工困在了井下。
5.
Technology and practice of fire extinguishing to the mineral slag spontaneous combustion at well Ⅱ industral Plaza in Pingshuo Anjialing coal mine
平朔安家岭二号井工矿工业广场矿渣自燃灭火治理技术与实践
6.
Study of the GIS-Based 3-D Visualization Information System about Mining Working Face;
基于GIS的矿井工作面三维可视化信息系统研究
7.
There were seventy men in the mine when it blew up.
矿井爆炸时,井里有70 个矿工。
8.
The Research on Signal Acquisition Technology of the Miner Safety-monitoring Intelligent Helmet under Mine-shaft;
矿工井下安全监测智能头盔的信号采集技术研究
9.
The mines have been closed by a strike .
由于罢工矿井关闭了。
10.
Lawer Third System Red Bed Grouting in Air Shaft Ground Pregrouting in Yangcun Coal Mine
杨村煤矿风井地面预注浆工程的下第三系红层注浆
11.
laborer who works in a mine.
在矿山或矿井工作的劳工。
12.
Research on Coal-Rock Movement Law and Drawing Technology for Fully Mechanized Caving Face of Special Thick Coal Seam in the Anjialing No.2 Coal Mine;
安家岭2号井工矿特厚煤层综放工作面煤岩活动规律及放煤工艺研究
13.
The Simple Study of Rapid Construction of Auxiliary Shaft in EightBao Coal Mine
八宝煤矿副井井筒快速施工作业浅析
14.
Construction technology for auxiliary shaft crosscut in huerxinhe coal mine
霍尔辛赫煤矿副井井筒揭煤施工技术
15.
Exploration and Practice on Mine Connection Survey of Anjialing No.1 Mine
安家岭井工一矿矿井联系测量探索与实践
16.
Xing′an Coal Mine in Seven D2 Inclined by People of in Cable Car Installations
兴安矿中七D2号斜井乘人缆车装置
17.
Pulse power spectrum analysis and communication performance based on UWB in coal mine well
矿井UWB信号功率谱分析及传输性能
18.
because of conditions in the mine, miners are predisposed to lung disease.
由于矿井的环境,矿工很容易患肺