1.
On Application of Sublevel Drilling and Stope Mining Method in Mining Thin Lode of Shouyun Iron Mine
分段凿岩阶段矿房法在首云铁矿薄矿脉开采中的应用研究
2.
Optimization of parameters when practising multi unit and muti step stage room mining method
多单元多步骤阶段矿房采矿法参数优化
3.
Distribution structure and parameter determination of medium-length holes in stage room mining method
阶段矿房采矿法中深孔布置结构及参数的确定
4.
Discussion on Anti-sulfuration Dust Explosion Measurement in Multicell and Multi-process Phase Mining
多单元多步骤阶段矿房采矿法防硫化矿尘爆炸措施的探讨
5.
Finite Element Analysis of Filling Mass -Orebody-Rock Mass Stability for High-Level-Mining in Anqing Copper Mine
安庆铜矿高阶段回采充填体—矿体—岩体稳定性的有限元分析
6.
Study of Sub Class of Rock Mass in Construction Moment Based on Theroy of Qualification;
基于数量化理论的岩质围岩施工阶段亚级分级方法研究
7.
Optimization of drilling and blasting parameter of fracture rock
破碎矿岩凿岩爆破参数优化方法探讨
8.
On such a basis, the author has established the model for applying geophsical and geochemical techniques to different stages of prospecting for interstratified oxidation zone sandstone type uranium deposits.
在此基础上,建立了不同阶段物化探方法寻找层间氧化带砂岩型铀矿的找矿模式。
9.
sublevel blast-hole method
深孔分段崩落采矿法
10.
Movement Monitor and Analysis of -400~-510 m Mid-section in Anqing Copper Mine
安庆铜矿-400~-510m中段岩移监测分析
11.
Study on Rock Mass Sub-Classification in Construction Stage for Road Tunnel;
公路隧道施工阶段岩体围岩亚级分级研究
12.
Study of quantification theory of rocky surrounding rock sub-classification during construction
岩质围岩施工阶段亚级分级的数量化理论研究
13.
On the Methods for Surrounding Rock Classification in Construction Stage of Highway Tunnels with High Geostress
高地应力公路隧道施工阶段围岩分级方法研究及应用
14.
The Application of Digital Simulating Method in the Optimization on Mining System Design of Block Stoping;
阶段空场法采矿系统设计优化的数值分析方法及应用
15.
STUDY ON STABILITY OF STOPE IN ROOM HIGH-LEVEL LARGE-DIAMETER LONGHOLE MINING IN ANQING COPPER MINE
安庆铜矿矿房高阶段大直径深孔采矿采场稳定性研究
16.
The Risk Analysis on Phase of Real Estate Marketing and Building Management;
房地产租售与物业管理阶段风险分析
17.
THE HIGH BENCH LONG HOLE MINING IN ANQING UNDERGROUND COPPER MINE
安庆铜矿高阶段大直径深孔采矿法实施方案
18.
This paper put forward a new method to carry out dynamic appraisal of the extent of resources utilization in each stage of gold mine production by using differential grade index.
文中提出了应用级差品位指标动态评价岩金矿山生产各阶段资源利用程度的新方法。