1.
Determination and Optimization for Operation Scheme of Intermediate Station in Gas Pipeline
天然气管道中间分输站运行方案的确定与优化
2.
Analysis on Implementing the ISO9000 Authentication in Railway Stations and Depots;
铁路运输站段实施ISO9000标准认证的分析
3.
Efficiency Analysis of Light Coal Tar in Heating of Pumping Stations
煤焦轻油在输油站加热中的效能分析
4.
oil transfer station
输油中转站 -输油气
5.
Analysis of Models of Container Transport Within the Influencing Range of Railways Central Station for Container Transport;
铁路集装箱中心站吸引区集装箱运输模式分析
6.
Time-history analysis of New Guangzhou Railway Station under multi-support seismic excitation
广州新客站结构多点输入地震反应分析
7.
Gravel-soil screening-conveying system for construction of Pubugou Hydropower Station
瀑布沟水电站施工砾石土筛分输送系统设计
8.
Analysis of Effect of Transformer Substation Originated Outages on Transmission System Reliability
变电站相关故障对输电系统可靠性影响的分析
9.
Analysis of hydraulic vibration characteristics of long pressurized piping system in hydropower station
长有压输水系统水电站水力振动特性分析
10.
The Analysis of the Base Station Flash off Caused by Transmission Line Fault
传输线路故障造成基站闪断的分析处理
11.
Architectural Design for Subway Stations in Guangzhou Automatic Passenger Transporting System
广州市乘客自动输送系统的分建车站建筑设计
12.
Monitoring and Analysis of a Water conveyance Culvert Under-passing Wukesong Metro Station
输水暗涵下穿地铁五棵松站工程专项监测分析
13.
Time-history analysis of Wuhan railway station under multi-support seismic excitation
武汉火车站多点输入地震反应时程分析
14.
Reliability analysis of pump stations of transmitting crude oil proves that the formulas are uncomplicationed.
在输油泵站系统可靠性分析中表明,这些表达式简单实用。
15.
there is an important tube station with escalators leading down to two different lines.
有个重要的地铁站。自动扶梯将乘客分别输送到下面条不同的路红。
16.
The approach utilizes distributed microprocessor-based modules located within the substations and out on the transmission and distribution system.
此方法利用在输配电系统中和在变电站内分布的微处理机模块
17.
Note: This is not where you log in to the IMS! Only editors of this website need to log in here.
要访问网站的这部分内容,您需要输入您的用户名和口令。
18.
Analysis of Influence of Unbalanced Transport on the Capacity of Large Marshalling Yard after Speeding-up;
提速后不均衡运输对大型编组站能力的影响分析