1.
Ideological Condition of Young Workers in Liuzhou No.2 General Air- Compressor Manufactory:A Survey;
柳州第二空压机总厂青工思想状况调查分析
2.
5~# Unit Low Vacuum Transformation in Baotou Secondary Thermal Power Plant
包头第二热电厂5~#机低真空改造
3.
two-stage stationary air compressor
二级固定式空气压缩机
4.
two-stage rotary air compressor
二级旋转式空气压缩机
5.
Analysis on hydraulic oscillating fault in continuous caster in No.3 Steelmaking Plant of WISCO
武钢炼钢总厂三分厂连铸机液压振动故障浅析
6.
They translated some documents for the Second Disel Locomotive Factory.
他们为第二柴油机厂翻译了部分资料
7.
Reformation Practice of “Three Change Two” Blast Furnace in No.1 Iron Making General Plant Of Maanshan Iron & Steel CO. Ltd;
马钢第一炼铁总厂“三改二”高炉改造实践
8.
CAL flight 22.
中华航空公司第二十二班机。
9.
The Variable Frequency and Set Pressure Closed Loop Control to Air Compressor on the Chemical Fibre Factory;
空压机变频恒压闭环控制在化纤厂的运用
10.
Application of MH110 double-screw rod air compressor in gas turbine power plant
MH110双螺杆空气压缩机在燃机电厂的应用
11.
First ROKOP CCM achieved productionquota smoothly at Handan Iron & SteelGeneral Works
邯郸钢铁总厂第一台罗可普连铸机顺利达产
12.
Summarization on the application effect of belt pressure filter in Panbei Coal Preparation Plant
盘北选煤厂尾煤带式压滤机使用效果总结
13.
MODIFICATION OF DRAIN MODE IN HIGH-PRESSURE STEAM CONDUCTING PIPE TO STEAM TURBINES OF QINSHAN NUCLEAR POWER PLANT NO.3
秦山第三核电厂汽轮机高压导汽管疏水改进
14.
Energy Efficiency Reform Design for the 6 kV High Voltage Electrical Motor of Lanzhou Refinery’s Third Recycling Water Pool
兰州炼油厂第三循环水场6kV高压电机节能设计
15.
A summary on maintenance of a DH63-32 type centrifugal air compressor
DH63-32型离心空压机检修总结
16.
CCM Revamping Scheme and Technological Analysis of Wuhan I/S (Group) Co. Steel Plant No.2
武钢第二炼钢厂连铸机改造方案及其工艺分析
17.
The Automatic Batching System of 265m~2 Sintering Machine of TISCO NO. 2 Iron-making Plant;
第二炼铁厂265m~2烧结机自动化配料系统
18.
THE TRANSFORMATION OF ELECTRICAL ENERGY-SAVING IN SINTER DUST-CLEARING FAN
济钢第二炼铁厂烧结除尘风机电气节能改造