1.
How to Calculate the Economic Loss of Railway Sector Due to Train Delay Caused by Construction Across Railway Lines;
跨线施工延误列车运行铁路经济损失费用的计算
2.
Delay Analysis of Road Work Zone By Traffic Simulation Technology
![点击朗读](/dictall/images/read.gif)
道路施工区车辆延误分析与交通仿真研究
3.
prolongation costs
![点击朗读](/dictall/images/read.gif)
工程延误引致的额外费用
4.
This work demands your attention without delay!
![点击朗读](/dictall/images/read.gif)
这工作急需你去做,不得延误!
5.
Owing to the recent bad weather, the work is several weeks behind schedule.
![点击朗读](/dictall/images/read.gif)
由于最近天气不好,工作延误了几周。
6.
Factors that conspired to delay the project.
![点击朗读](/dictall/images/read.gif)
凑在一起造成工程延误的因素
7.
The strike caused a great delay in the delivery of the mail.
![点击朗读](/dictall/images/read.gif)
这次罢工严重地延误了邮件的投递。
8.
Research on Influencing Factors of Schedule Delays in Construction Projects;
![点击朗读](/dictall/images/read.gif)
建设项目中的工期延误影响因素研究
9.
A Study on Responsibility of Project Delay Based on Shapley Value;
![点击朗读](/dictall/images/read.gif)
基于Shapley值的工期延误分析
10.
STUDY ON THE PRINCIPLE OF DELAY CLAIMS WITH MULTI-EVENT INTERFERENCE;
![点击朗读](/dictall/images/read.gif)
多事件干扰下工期延误索赔原则研究
11.
Analysis of Clients'Counter Claim Because of Project Delay
![点击朗读](/dictall/images/read.gif)
工期延误引起的业主反索赔分析初探
12.
Delay Influence and Its Mitigation Measures of Train Operation in Urban Rail Transit
![点击朗读](/dictall/images/read.gif)
城轨交通列车运行延误影响及其减缓措施
13.
Analysis of Passengers Delays Based on Queue Theory of Subway Stations
![点击朗读](/dictall/images/read.gif)
基于排队论的地铁站台设施客流延误分析
14.
The Study on the Cause of Delay & the Model of Early Warning in Construction Project;
![点击朗读](/dictall/images/read.gif)
工程项目工期延误原因及预警模型研究
15.
Analysis on Articles about Construction Period Delay and Compensation in Engineering Con-struction Contract;
工程建设合同工期延误与赔偿费条款分析
16.
Expense Claim for Construction Delay of International Water Conservancy Project;
![点击朗读](/dictall/images/read.gif)
关于国际水利工程工期延误的费用索赔浅析
17.
"whenever, planning or execution of the Works in likely to be delayed or disrupted unless any further drawing or instruction is issued by the Engineer within a reasonable time."
如果工程师未在合理时间内发出进一步的图纸和指示并有可能造成工程计划和施工的延误或中断
18.
The bad weather will set back our building plans.
![点击朗读](/dictall/images/read.gif)
恶劣的天气将使我们的施工计划延后。