1.
Other project: Repair & maintenance, ductwork of water & power, epoxy coating ground, loading & unloading, emergency labor service etc.
零星工程:维修、保养、水强弱电、环氧地平、起重搬运、劳务应急输出等。
2.
The merchant could only pay the laborer in driblets.
那商人只能零星地付给那工人工钱。
3.
Infrastructure works are tentatively scheduled to commence in late 2000 for completion in 2004.
基础建设工程暂定于二零零零年底展开,于二零零四年完成。
4.
The construction is expected to start in August 2002 for completion in 2007.
工程预计在二零零二年八月动工,二零零七年竣工。
5.
Collins picked up a few dollars a week doing odd jobs.
柯林斯靠做零工每星期弄到几块钱。
6.
IF AR TAKES CHARGE OF CONSTRUCTION WORKS, SUPERVISING FEE IS INCLUDED.
零星扩建改装与特殊工程之配合设计收费,不同于上述计量标准,须另行议。
7.
In the five-year period from 2001-02 to 2005-06, $6.5 billion will be spent on these projects.
在二零零一/零二至二零零五/零六年的五年期间,这些工程的开支约达65亿元。
8.
He was trying to support a wife and a child on a parttime $26-a-week job.
他靠着一份每星期二十六美元工资的零星工作来养活老婆孩子。
9.
AN ALGORITHM FOR SATALLITE IMAGE EPIPOLAR DETERMINATION BASED ON ZERO ELEVATION
基于零高程点的卫星影像核线确定方法
10.
oddments of food [information]
零碎 [零星] 的食物 [信息]
11.
The rest will have their works completed by August 2000.
其他学校的工程则会在二零零零年八月或之前完成。
12.
Work on the last section of the primary road link to Ma On Shan Town Centre is scheduled for completion in 2000.
马鞍山市中心主要连接路最后一段工程,定于二零零零年完成。
13.
They are called Sunday engineers.
他们被为星期日工程师
14.
Phase II, which includes the reclamation and engineering infrastructure for the town centre northern area, will be completed early in 2000.
第II期工程包括为市中心北部进行填海及基础建设工程,将于二零零零年初完成。
15.
Parameterize Design and Engineering Analysis of Engine Parts;
发动机零部件参数化设计及工程分析
16.
By Developing "Three Zero" Management Project Forges Brand of Xiqu Coking Coal;
开展“三零”管理工程 锻造西曲焦煤品牌
17.
The application of part finite element Analysis base on reverse engineering
基于反求工程技术的零件有限元分析
18.
Engineering Example of Zero Discharge of Regenerated Papermaking Wastewater
废纸造纸废水处理“零排放”工程实例