1.
Reflections on compensation for damages caused by liability of construction quality;
施工质量责任引发损害赔偿问题的思考
2.
Fully responsible for construction project quality, schedule, safety and construction.
对项目工程质量、期进度、全生产、明施工负全面责任。
3.
Reconstruction of Quality Liability Period After Practical Completion and Determination of Reasonable Duration in China;
我国工程完工后质量责任阶段重构及期限确定
4.
Quality inspection and control systems will be strengthened and a quality responsibility system as well as a life-long guarantee system will be exerted for the construction projects .
完善监理制度,加强工程质量监督,建立和落实工程质量责任制、工程质量终身负责制。
5.
The corrective actions are assessed by the Quality Dept. and implemented by the responsible departments.
质量部对采取措施的方案进行评价,由责任部门具体实施。
6.
Service Liability for Tort Is an Independent Quality Liability for Tort;
服务侵权责任是独立的质量侵权责任
7.
It is the duty of every commercial worker to improve his service continually.
不断提高服务质量,是每一个商业工作者的责任。
8.
Strengthening the Awareness of Responsibility,Improving the Work of Quality Control of Sci-tech Periodical;
强化责任意识 做好科技期刊质量管理工作
9.
Improve Quality and Quantity Management by Strengthening Monitor and Making Responsibility Clear.;
强化监管,明确责任,扎实推进安全数质量工作
10.
On Classroom Teaching: the Main Position of Quality Project and Responsibility;
论课堂教学:质量工程的主阵地与责任主体
11.
Strengthening the Constructions of the Executive Editor s Work System Improving Quality of the Journal Edition;
加强责任编辑工作制度建设 提高学报编辑质量
12.
On the Enactment of Engineering Defect Liabilities in "Construction Law" and "Contract Law;
论《建筑法》和《合同法》对建筑工程质量责任的设定
13.
On the responsibility of design units in the damage compensation of architectural project quality
谈设计单位在建设工程质量损害赔偿中的责任
14.
The Civil Responsibility of Environmental Pollution in Building Construction;
建筑施工环境污染民事责任归责原则
15.
Study on the Nature and Distribution of Tort Liability of Communal Facilities;
论公有公共设施侵权责任的性质与责任分配
16.
Quality Dept. is responsible for verifying the implementation and effects of the solutions.
质量部组织对责任部门实施情况和效果进行验证。
17.
All responsible departments should take corrective actions according to the correction proposals from Quality Dept.
各责任部门应根据质量部提出的整改意见进行纠正措施。
18.
Currently, I'm the general engineer of Shenyang Machine Tools Plant in charge of Quality control.
目前我任沈阳机械工具厂总工程师,负责质量控制。