1.
The date of acceptance of this plant will be April sixth, nineteen eighty-four.
这座工厂的交工验收期将在一九八四年四月六日。
2.
Anticipated date of taking over of the project
预计工程验收交接日期
3.
Confirm in middle period: the customers confirm the Conceal facets in project, woodwork, water, and electricity. Then they will pay the medium money style.
中期验收:隐蔽工程及木工、电等的验收。验收合格后顾客交付中期款。
4.
Code for acceptance of public packet switched data network engineering
公用分组交换数据网工程验收规范
5.
After testified to be qualified, the project can only be transferred to client to use.
本工程竣工并验收合格后,才能交付发包人使用。
6.
Standard for quality inspection and assessment of railway digital telephone switching engineering
铁路数字程控交换通信工程质量评定验收标准
7.
CHECK AND ACCEPT MEASUREMENT OF UNDERGROUND ORBIT TRAFFIC OF GUANG ZHOU CITY
广州市地下轨道交通竣工验收测量探索
8.
delivery inspection; pre-delivery inspection
出厂检验(交收检验)
9.
Responsible for expediting, inspection, transportation, receiving and issuing.
负责货物催交、验、流运输以及材料、备的现场收发工作。
10.
check and acceptance of the completed capitalconstruction project
基本建设工程竣工验收
11.
Code for construction and acceptance of industrial boiler installation engineering
工业锅炉安装工程施工及验收规范
12.
Code for construction and acceptance of brick works for industrial furnaces
工业炉砌筑工程施工及验收规范
13.
Code for construction and acceptance of industrial metallic pipeline engineering
工业金属管道工程施工及验收规范
14.
Code for construction and acceptance of chemical metallic piping
化工金属管道工程施工及验收规范
15.
Code for construction and acceptance of steel structure for petrochemical industry
石油化工钢结构工程施工及验收规范
16.
unified standard for construction and acceptance for petrochemical engineering
石油化工工程施工及验收统一标准
17.
Several Thinkings on Acceptance and Recording of the Project after its Completion;
对工程竣工验收备案工作的几点思考
18.
Acceptance inspection of class 2 alternating current watthour meters
GB/T3925-19832.0级交流电度表的验收方法