说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 大唐长山热电厂
1.
Analysis for Shutdown of 100 MW and Below Generating Units in Datang Changshan Thermal Power Plant;
大唐长山热电厂100MW及以下机组关停分析
2.
Analyze the Heat Supply Pattern of Thermal Power Plant in TangShan-xinqu and Research in Its Ameliorative Scheme;
唐山新区热电厂供热方式分析及改造方案研究
3.
Somewhat lower temperature phenomenon of main steam has been existing for a long time on boiler on.5 in Datang Taiyuan Co-generation Power.
大唐太原第二热电厂5号炉长期以来存在著主蒸汽温度偏低现象。
4.
Post-Evaluation for Phase Eight Extension Project of Datang Baoding Co-Generation Power Plant;
大唐保定热电厂八期扩建工程项目后评价
5.
Karst Development Law and Treatment Measures of Foundation in Datang Power Plant,Linzhou
大唐林州热电厂岩溶发育规律及地基处理方案
6.
Analysis and Research on Blending Coal Combustion Performance of DaTang Panshang Power Plant 2×600MW Boiler;
大唐盘山电厂2×600MW锅炉混煤燃烧优化分析与研究
7.
Research on Water Level Adjustment of Deaerator Operation in Tianjin Datang Panshan Power Plant
大唐盘山电厂除氧设备运行中水位突变问题解决
8.
Application of gas tower integration to China Datang Harbin No.1 Thermal Power Plant
烟塔合一技术在大唐哈尔滨第一热电厂工程中的应用
9.
Discussion on powder treatment of coal conveying system in Dalian Taishan Thermal Power Plants
大连泰山热电厂运煤系统粉尘治理措施
10.
Analysis and Forcast on the Second Stage of Heat-supplying Market of Datang Changchun Second Thermal Power Co.Ltd;
大唐长春第二热电有限责任公司二期供热市场分析及预测
11.
THE OPTIMIZATION OF THE MAIN FACTORY ROOFING SYSTEM ON 1250 HOT ROLLED THIN PLATE PROJECT OF TANGSHAN GANGLU
唐山港陆1250热轧薄板工程主厂房屋面系统优化
12.
Preliminary Study on Outage Cycle Extension of Qinshan CANDU NPP
秦山CANDU核电厂大修周期延长的初步研究
13.
The Study with Water Intaking and Entrainment Effect to Changshan Plankton of Power Plant in Kuli Pool;
长山热电厂取排水对库里泡浮游生物影响及卷载效应的研究
14.
Research on the Effect of Thermal Discharge from Changshan Heating and Power Plant to Aquatic Organisms in Kuli Pool;
长山热电厂温排水对库里泡水生生物影响的研究
15.
Study on Water Resources in the Third Project of Chen Ming Thermoelectricity Factory of Shandong;
山东晨鸣热电厂三期工程水资源研究
16.
Environmental Impact Assessment of Thermal Power Plant Extension Project in DaTang WeiShui;
大唐微水发电厂扩建项目环境影响评价研究
17.
On Sinking Well Construction of Circulating Water Bumping Room of Ningde Power Plant in Datang, Fujian
福建大唐宁德电厂循环水泵房沉井施工
18.
Anticorrosion Measures of Steel Structure in Datang Yantan Hydropower Station
大唐岩滩水力发电厂金属结构的防腐蚀措施