说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 龙滩移民
1.
Discuss the Change of Immigrants Consumption forms in Guangxi--A Case of Lianqian Village;
浅析广西龙滩移民消费生活方式的变迁——以连迁移民新村为例
2.
Discussion on Favoring the People of Relocation by Aquatic Breeding in Luodian Reservoir of Longtan Hydropower Station;
龙滩水电站罗甸库区水产养殖反哺移民的探讨
3.
Discussions on several major problems in the work of land requisition and resettlement for the Longtan Hydropower Project;
龙滩水电站征地移民工作中几大问题的探讨
4.
An Investigation on the Adaptability of Immigrants of Longtan,Guangxi--A Case of Lianqian Village;
广西龙滩库区移民适应性的个案考察——以连迁移民新村为例
5.
The reservoir of Longtan Hydropower Station will inundate some areas of Guizhou and Guangxi Provinces, with large inundation area and a lot of relocated people.
龙滩水电站水库淹没涉及贵州、广西两省区,淹没面积大、移民人数多。
6.
Or you can go exploring for fossils of the earliest residents of the Gobi-dinosaurs.
或去探索戈壁滩早期的原居民-龙化石。
7.
To Build"Competitive Longtan Product"Culture with Longtan Characteristics
构建具有龙滩特色的“精品龙滩”文化
8.
On the Sustainable Development of Population Migration in the Reservoir Area of Guangxi Yantan Hydropower Plant;
广西岩滩水电站库区移民可持续发展研究
9.
Production resettlement for inhabitants in Letan reservoir irrigation area;
乐滩水库引水灌区工程移民生产安置浅析
10.
Forge A “Top-quality Longtan” and A “Green Longtan” and Form an Enterprise Culture with Longtan Characteristics;
打造“精品龙滩、绿色龙滩” 建设具有龙滩特色的企业文化
11.
Monitoring on Land Use Changes in Huanghuatan Ecologgical Immigrant Region in Recent 10 Years;
武威市黄花滩生态移民区近十几年来土地利用变化监测
12.
Realistic Problems and Countermeasures to Heilongjiang Province Farmer Industry Shift;
黑龙江省农民产业转移的现实问题与对策研究
13.
From Conflict To Cooperation: The Interest Relationship Analysis Between Government and Citizen--taking tan-keng area’s immigration as an example in QingTian county Zhejiang province
从冲突走向合作:政府与民众的利益关系解析——以浙江省青田县滩坑移民为例
14.
Flood Prevention Dispatching Decision Support System in Huang Longtan Hydro Power Station
黄龙滩电厂防洪调度决策支持系统
15.
Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area
龙滩水电站坝址区平洞结垢量的估算
16.
Elementary Introduction on the Cost Control in the Joint Venture by Sinohydro Engineering Bureaus 1,4,7 & 8;
浅谈龙滩工程1478联营体的成本控制
17.
Financing for the Longtan Hydropower Project and its funds management;
龙滩水电站工程融资和资金使用管理
18.
Attenuation of P,S and coda waves in Longtan reservoir region
龙滩水库地区P波、S波和尾波衰减