说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 四期工程
1.
Statistical analysis of the phase Ⅳ project of Three-North Shelterbelt in Hebei Province;
河北省三北防护林四期工程统计分析
2.
Study on the Application of High Performance Concrete in the Forth Phase of Beilun Port Project;
高性能混凝土在北仑四期工程中的应用研究
3.
The Planning Study of the Fourth Project for Three-North Forest Shelterbelt in the West of Jilin Province;
吉林省西部‘三北’防护林四期工程规划研究
4.
Practice of Nationalization of Technology and Equipments of SPC Phase IV Project;
上海石化四期工程技术和装备国产化的实践
5.
Achievement and Its Development Strategy of "Three-North" Protection Forest Development Programme (Phase IV) in Shaanxi Province;
陕西省三北防护林四期工程建设成效与发展对策研究
6.
Three-North Shelterbelt Project during the Implementation of Investment and Management in the 10th Five-Year Plan;
三北防护林四期工程“十五”投资执行及管理问题初探
7.
The Construction of "Great Four Projects"--- The Most Important Task During The Initial Stage of Anhui Institute of Athletics;
安徽体院初创时期应抓好的四大工程
8.
"the Construction of Four"Project Analysis and Design
“四期建设”工程项目的分析与设计
9.
A Study on the Employment of Migrate Workers in the Construction of National Defense Projects of Sichuan during the Anti-Japanese War;
抗战时期四川国防工程建设征用民工情况探析
10.
On remuneration of Sichuan peasant-workers in national defense engineering construction during Anti-Japanese War;
抗战时期四川国防工程建设征用民工的待遇
11.
Study on Some Key Techniques for the Forth Stage Retaining Dyke Project in Beilun of Ningbo Port;
宁波港北仑四期围堤工程关键技术研究
12.
Power supply and lighting engineering design for Qingdao Container Terminal Phase IV project
青岛集装箱码头四期供电照明工程设计
13.
Pollution-prevention for Land Formation Project of the First Four Berths of Dayaowan 1st-phase Project of Dalian Port
论大连港大窑湾港区一期工程前四个泊位陆域形成工程污染防治
14.
The Pre-Comprehensive Evaluation of Phase Ⅳ 4X1000MW Project Construction Program in ShiHeng Power Plant
石横电厂四期4X1000MW工程建设项目前期综合评价研究
15.
On the Fund for the Employment of Migrant Laborers in the National Defenses in Sichuan During the Prophase of the Anti-Japanese War
抗战前期四川国防工程建设征用民工的经费来源
16.
Four-stage-engine Operation
四行程发动机工作过程
17.
The initial four clusters are electronics, information technology, biotechnology and precision engineering.
初期的四个组包括电子、资讯科技、生物科技和精密工程。
18.
Sichuan Guangan Power Plant Project Phase I(2×300 MW), won the State Excellent Design Silver Medal in2002.
四川广安电厂一期工程,2×00MW机组,2002年荣获国家优秀设计银质奖。