说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 黄河水电
1.
Analysis of Million-Kilowatts-Class Hydropower in Huanghe Hydropower Development Co.,Ltd.Involved in Electricity Market
黄河水电公司百万千瓦级水电站参与电力市场的分析
2.
The Analysis of Land Use and Landscape Pattern in Hydropower Cascade Exploitation Region of the Yellow River
黄河水电开发区域土地利用与景观格局分析
3.
Hydroelectric exploitation on the main stream of the Yellow River in Gansu Province and Regional Economic Development;
甘肃黄河干流水电开发与黄河流域经济发展
4.
Studies on Geohazards of Reservoir Banks of Jishi Valley Hydropower Station, Huanghe River;
黄河积石峡水电站库岸地质灾害研究
5.
Evaluation on Benefits and Construction of Hydraulic and Hydroelectric Projects on the Upper Reaches of the Yellow River
黄河上游水利水电工程建设与效益评价
6.
KATST LEAKAGE PROBLEM IN WATER CONSERVANCY AND HYDROELECTRIC POWER PROJECT IN THE NORTH OF THE NORTH MAIN RIVER OF THE YELLOW RIVER
黄河北干流北部水利水电工程的岩溶渗漏问题
7.
Study on Enterprise System Reform of Qinghai Yellow Designing Company;
青海黄河水利水电咨询有限公司企业改制研究
8.
Project claim and claim processing during construction of Xiaolangdi Water Control Project on Yellow River;
黄河小浪底水利水电工程索赔及其处理
9.
Selection of main design parameters for turbines of Laxiwa hydropower station
黄河拉西瓦水电站水轮机主要参数选择设计
10.
Power Generation Loss Analysis and Caculation about Longyang Xia Hydroelectric Power Station in the Yellow River;
黄河龙羊峡水电站发电损失分析及测算
11.
Short-time Economic Dispatching Research on Yellow River Multi-reservoir System of Gansu Power System;
甘肃电网黄河梯级水电站短期经济调度研究
12.
Study on Power Transmission Planning of Longyangxia Upriver Hydropower Cascade Stations;
黄河龙羊峡上游水电站群输电规划研究
13.
Consultancy and Study of Design of Huanghe River Bridge at Gongboxia Hydropower Station
公伯峡水电站黄河大桥设计咨询与研究
14.
Evaluation Study of Compensating Regulation of Cascade Reservoirs on the Main Stream of Yellow River;
黄河干流梯级水库电站补偿调节方案评价研究
15.
Analysis & Study on Stability of NO.2 Landslide for Lijiaxia Hydropower Station on Yellow River;
黄河李家峡水电站Ⅱ号滑坡稳定性分析研究
16.
The Theory and Practice of Cascade Hydroelectric Scrolling Development of Huanghe Upstream;
黄河上游梯级水电滚动开发理论与实践
17.
Study on Compensation Benefit and Distribution Project in the Main Stream of the Yellow River;
黄河干流供水发电补偿效益及其分配方案研究
18.
Insisting on scientific development view to speed up the hydropower development in the upstream of the Yellow River;
坚持科学发展观 加快黄河上游水电开发进程