1.
Scheduling of Multi-stage Batch Processes with Finite Intermediate Storage;
中间品储存约束的多工序批量加工排序问题研究
2.
Setting up Mathematical Models on Sequencing the Unit Processing;
关于零件加工排序问题数学模型的建立
3.
A Scheduling Problem in Group Technology with Earliness Award and Tardiness Penalty
一类超前有奖延迟受罚的成组加工排序问题
4.
Minimizing makespan on a batching machine with batch arrivals
极小化最大完工时间的批到达同时加工排序问题
5.
Scheduling Models with Jobs' Processing Times Being Nonconstant;
工件加工时间非恒定的排序模型研究
6.
Some Scheduling Problems with Environment Dependent Processing Times
几类加工时间与环境有关的排序问题
7.
A StUDY ON OP IMAL SOR ING ALGORI HM OF WORKPIECE PROCESSING RELA IVE SUPERIOR RECURRENCE ME HOD
工件加工最优排序算法研究——相对优势递推法
8.
Probe into the Machining Operations Arrangement and the Milling Method of Key Groove on the Shaft
轴上键槽加工工序安排及铣削方法探讨
9.
Optimization Operation Sequence in CAPP Using an Ant Colony Algorithm Based on Constraint Matrix
基于约束矩阵与蚁群算法的CAPP加工工序优化排序
10.
Allows you to add, remove, and change the order of the toolbar buttons.
添加、删除工具栏按钮并更改其排列顺序。
11.
Single Machine Scheduling Problem with Minimizing Weighted Completion Times with Resource Constrained;
资源有限的加权总完工时间单机排序问题
12.
The 0-1 Programming Model of Optimal Scheduling in Enterprisire Cooperative Processing;
企业合作加工最优排序的0—1规划模型
13.
Research on Remediation Priority Method for Levee Engineering Based on Risk Analysis
基于风险分析的堤防工程加固排序方法研究
14.
A Semi-Online Algorithm for Solving the Single Machine Scheduling Problem to Minimize Total Weighted Completion Time with Discounted Factor
折扣加权总完工时间问题的半在线排序算法
15.
Resolution to the Problem of Tool Disc Changer Lost
加工中心盘式刀库换刀子程序丢失的故障排除
16.
The Parallel Batch Scheduling Problem with Family Jobs and Equal Processing Time to Minimize the Weighted Total Completion Time
加工时间相同的分族分批排序加权总完工时间问题
17.
Single Machine Scheduling Under job Processing time is a Linear Deterioration of its Start time
工件加工时间是开工时间线性函数的单机排序问题
18.
A Batching Scheduling Algorithm for Maximizing Total Weigted Number of Jobs Completed in Due Date Window;
交货时间区间内加权完工工件个数最大的分批排序算法