说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 水电站导流洞
1.
Concrete construction technique for lining of diversion tunnel(No.1 tender section) of Pengshui Hydropower Station on Wujiang River
乌江彭水水电站导流洞第一标段洞身混凝土施工技术
2.
The Research on Diversion Tunnel Landslip of Yalong River Jinping Hydroelectric Powerstation;
雅砻江锦屏水电站导流洞工程塌方机理研究
3.
Deposition on Excavation and Construction for Soft Rock on Bad-section in Diversion Tunnel of Nansha Hydropower Station;
南沙水电站导流洞地质不良段开挖施工处理
4.
Cracks Treatment Technology of Lining Concrete of Diversion Tunnel in Xiluodu Hydropower Station
溪洛渡水电站导流洞衬砌混凝土裂缝处理技术
5.
3-D Finite Element Analysis of a Control Section of Diversion Tunnel of a Hydropower Station
水电站导流洞控制段三维有限元分析
6.
Prototype Observation and Result Analysis on Diversion Tunnel at Shenxigou Hydropower Station
深溪沟水电站导流洞原型监测及成果分析
7.
Variable Fuzzy Evaluation Method for Analysis of the Stability of Surrounding Rock in Diversion Tunnel of Hydro Project
水电站导流洞围岩稳定性的可变模糊评价方法
8.
The Excavation and Support Process Simulation Analysis of the Diversion Tunnel for Construction of Shimenkan Hydropower Project
石门坎水电站导流洞开挖支护过程模拟分析
9.
High Slope Anchorage at Diversion Tunnel Inlet of Shenxigou Hydropower Station
深溪沟水电站导流洞进口高边坡锚固技术研究
10.
Construction of the Crown Concrete of the Intersection Section of Diversion Tunnel and Middle Flood Discharging Tunnel in the Jishi Gorge Hydropower Station
积石峡水电站导流洞与中孔泄洪洞交叉段顶拱混凝土施工技术
11.
Stability Analysis of Surrounding Rock and Optimization of Supporting Structure in Pubugou Hydropower Station Diversion Tunnels;
瀑布沟水电站导流洞围岩稳定性与支护结构优化分析
12.
Processing Scheme for Roofdrop and Landslide of the Shallow-buried Section of Diversion Tunnel in the Longjiang Hydropower Station
龙江水电站导流洞塌方浅埋段冒顶塌方处理方案
13.
Excavation and support techniques for high slope at entrance of diversion tunnel of Pankou Hydropower Station
潘口水电站导流洞进口高边坡开挖与支护施工技术
14.
Structure Optimizing and Project Augmentation for Internal Dissipation Discharge Tunnel with Swirling Flow Reconstructed from Diversion Tunnel of Gongboxia Power Station;
公伯峡水电站导流洞改建为旋流式内消能泄洪洞的体型优化与方案比较研究
15.
Construction diversion tunnel(in combination with tailrace tunnel) design of Xiluodu Hydropower Station
溪洛渡水电站导流隧洞(与尾水洞结合段)设计
16.
Water Guiding Tunnel Slope Stability Analysis in Right Bank in JinChuan Hydro-power Station;
金川水电站右岸导流洞进水口边坡稳定性评价
17.
Optimization of Construction Schemes of Diversion Tunnel in Jinping Second Cascade Hydropower Station
锦屏二级水电站导流隧洞施工方案优化
18.
Construction Technology for Transition Section of Diversion Tunnel at Left Bank of Guandi Hydropower Station
官地水电站右岸导流洞进口渐变段施工技术