说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 烧堆措施
1.
Effects of sowing time, mound burning practice and timing of fungicide application in the management of potato late blight in Myanmar
不同播期、烧堆措施和定期喷药在缅甸马铃薯晚疫病综合防治中的作用(英文)
2.
Construction Measures of Hole Drilling of Prestressed Cable in Loose Deposit
松散堆积体预应力锚索钻孔施工措施
3.
Measures and Characteristics of Cooling at Shutdown Mode for China Advanced Research Reactor
中国先进研究堆停堆冷却措施及其主要特点
4.
External Reactor Vessel Cooling Measure in Severe Accident for Pressurized Water Reactor Nuclear Power Plant
压水堆核电厂严重事故下堆腔注水措施研究
5.
Study on Burning Law and Protective Measures of Split Air Conditioning
挂壁空调器燃烧规律及防护措施探讨
6.
A Systematic Review of Fires in the Operating Room and Countermeasures
手术室意外烧伤及防范措施研究现状
7.
"W" Flame Boiler Combustion Corrective Measure and Effect
“W”型火焰锅炉燃烧改进措施及效果
8.
Analysis to Deformation Mechanism of Sedimentary Slope after Excavation and Support Measure;
堆积体开挖边坡变形特征分析与支护措施研究
9.
Study on Injection Cooling during Severe Accidents for the Pressurized Water Reactor Nuclear Power Plant;
压水堆核电站严重事故下注水冷却措施的研究
10.
The Concrete Face Rock-Fill Dam Two-Layered Slab Anti-Crack Engineering Research;
混凝土面板堆石坝双层面板抗裂措施研究
11.
Study on Separation of Deck from Cushion of Concrete Face Rockfill Dam;
面板堆石坝脱空状况分析及其防止措施研究
12.
Studies on the Characteristics of Ammonia Volatilization and the Control Methods of Swine Manure Composting;
猪粪堆肥化处理氨气释放规律及调控措施研究
13.
Studies on Stress and Deformation Behaviors and Improvement Measures of High Concrete Face Rockfill Dam
高面板堆石坝应力变形特性及改进措施研究
14.
Influence of Different Cover Materials on NH_3 Volatilization from Chicken Manure Composting
不同覆盖措施对鸡粪堆肥氨挥发的影响
15.
Crack Mechanism Analysis of Concrete Face Slab of Rockfill Dam and Prevention Measures
面板堆石坝面板的裂缝机理分析与防裂措施
16.
Slope accumulation body stability of Zaoshi Hydropower Station and research on reinforcement measures
皂市水电站堆积体边坡稳定性及加固措施研究
17.
The Ways to Increase the Recovery Rate of Gold Leaching From Heap Leaching of the Earth's Surface Oxidation Ore in Jinshan Gold Mine
提高金山地表氧化矿堆浸金浸出回收率的措施
18.
Study on Concrete Face Rockfill Dam Construction Diversion Standard and Flood Passing Measures During Construction Period;
混凝土面板堆石坝施工导流标准及施工期渡汛措施研究