1.
MAXIMUM FUZZY INTEGRAL ESTIMATION OF FUZZY LOGIC REGRESSION MOD-ELS
模糊逻辑回归模型的最大模糊积分估计
2.
An evaluation of the undergraduates integrated attributes in sports dance by using the fuzzy integration combining with the hypothesis test;
采用模糊积分与统计假设检验方法相结合进行大学生体育舞蹈综合素质评估
3.
Evaluation of College P.E.Teachers Comprehensive Quality through Dual Fuzzy Integrals;
利用二重模糊积分进行大学体育教师综合素质评估
4.
ARMA-GARCH Model Estimator on VaR、CVaR and Kernel Type of Integral Estimator
VaR、CVaR的ARMA-GARCH模型估计和积分核型估计
5.
Fuzzy Integral Model in the Assessment for the Effectiveness of Government
模糊积分模型在政府有效性评估中的应用研究
6.
MEASUREMENT AND ESTIMATION OF THE CABLE TENSION BASED ON MAXIMUM ENTROPY SPECTRAL AND FUZZY CLUSTERING
基于最大熵谱和模糊聚类分析的斜拉桥拉索索力测试与评估
7.
The maximum-norm estimates of semi-discrete symmetric finite volume scheme for parabolic equations
抛物型方程半离散对称有限体积格式的最大模估计
8.
Optimized relative linear estimation on the parameters of fuzzy linear regression model;
模糊线性回归模型参数的最优线性相关估计
9.
A Submarine Operational Capability Evaluation Approach Based on Fuzzy Integral
基于模糊积分的潜艇作战能力评估方法
10.
Analysis of storage reliability based on fuzzy Bayesian estimate
基于模糊Bayes估计的贮存可靠性分析
11.
The Numerical Calculation for Fuzzy(H) Integral on Infinite Interval
无穷区间上模糊(H)积分的数值计算
12.
The Space of Fuzzy Chquet Integrable Functions and Set-valued Fuzzy Integral;
模糊Choquet可积函数空间与集值模糊积分
13.
The Existence of the Best Correction Estimates About Multiplication Error Model of a Kind of Function
一类函数积性误差模型最优校正估计的存在性
14.
The Model of Credit Risk Assessment in Commercial Banks on Fuzzy Integral Support Vector Machines Ensemble
基于模糊积分支持向量机集成的商业银行信用风险评估模型研究
15.
Optimization Method of Maximum Likelihood Eatimation Parameter Estimation Based on Fuzzy Genetic Algorithms
基于模糊遗传算法的极大似然参数估计
16.
In the end,classification results of each subspace are fused by means of fuzzy integral to get the final class.
最后,用模糊积分将子空间分类结果融合,得出最终类.
17.
Estimation & Application of the Biggest Form of An Analytic Function;
一个解析函数的最大模估计及其应用
18.
Maximum Norm Error Estimates For The stationary Stokes problems;
稳态Stokes问题的最大模估计