1.
Bulgarian President Requests not to Shut Down Nuclear Power Station Before its Time
保总统要求不提前关闭核电站
2.
So we are counting on sealing it in the second half of July, in accordance with the agreements reached at the six-party talks," the source said.
有消息透露,六国会谈达成一致意见:"所以我们计算在7月下半旬封闭核反应.
3.
intersessional departures from the approved calendar
在闭会期间更改已核定的会议日历
4.
North Korea is saying it has shut down a nuclear reactor.
北朝鲜声称:已关闭一座核反应堆。
5.
Model Selection of Large Current Enclosed Bus-bar for Nuclear Power Unit
核电机组大电流离相封闭母线的选型
6.
THERMODYNAMIC INVESTIGATION OF NEW NUCLEAR ENERGY BRAYTON CLOSED-CYCLE
新一代核能布雷顿闭式循环热力学分析研究
7.
The shutdown would be the first step toward denuclearization in nearly five years.
这次关闭将是近5年来弃核行动的第一步。
8.
Evolving and Closed Loop Feedback Control of Production in Core Enterprise under Supply Chain;
供应链核心企业生产的推演与闭环反馈控制
9.
Application of Forced Air Cooling Isolated-phase Bus to Ling'ao Nuclear Power Station
风冷式封闭母线在岭澳核电工程中的实践
10.
The effects of post space preparation and post restoration on apical sealing ability
桩道预备及桩核修复对根尖封闭性的影响
11.
Disposal and Close of Major Non-Conformity of Crack of Concrete Baseplate
核设施砼底板开裂的重大不符合项处理及关闭
12.
Bridge Balance Control of Fuel Handling Machine for Daya Bay Nuclear Power Plant
大亚湾核电站核燃料运输吊车桥架驱动双控制器闭环控制
13.
This modal inspector has been closed and cannot be used for further operations. Review your code.
该模块检查程序已经被关闭,并且不能用于以后的操作。请核对代码。
14.
Shutting down North Korea's main nuclear facility is only the first phase of the February agreement.
关闭朝鲜的主要核设施只是二月协议的第一阶段。
15.
Study and Design of Key Unit of Radio Block Center for High-speed Railway
高速铁路无线闭塞中心(RBC)核心单元的研究与设计
16.
The influence of urokinase plus in thoracic close drainage for adhesion of tuberculous pleurisy
胸腔闭式引流加尿激酶注入对结核性胸膜炎粘连的影响
17.
Psychological Interventions for Patients with Phobia Claustrophobia Induced by MRI Examination
核磁共振成像检查致幽闭恐怖症患者的心理干预
18.
Application of central venous catheterization in patients with tuberculous pleural effusion
中心静脉导管胸腔闭式引流术在结核性胸腔积液治疗中的应用