说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 台站水准
1.
DISCUSSION ON THE OBSERVATIONS AND SEISMIC ANOMALIES ON CHAOYANG AND JINXIAN SEISMIC STATIONS
朝阳、金县台站水准观测与地震异常探讨
2.
The diver poised himself on the edge of the high board.
跳水者在高台边上站稳。
3.
Study on the Bus-stop about the Arrival Law of Bus and the Service Level in City
城市公交车到站律及站台服务水平研究
4.
The conduction and damming current planning choice and the construction of Jilintai the first level hydroelectric power station
吉林台一级水电站导截流设计及施工
5.
Research of Supervisory Control System of Subsatation Based on IEC61850;
基于IEC 61850标准的变电站后台监控系统的研究
6.
They are going to dam up the river to set up a hydropower station.
他们准备拦江筑坝建水电站。
7.
Differences between chinese standards and ASME code for hydrostatic test of utility boiler
国内外电站锅炉水压试验标准的差异
8.
Study on Quasi Real Time System of Economical Operation of Hydropower Plant;
水电站厂内经济运行准实时系统研究
9.
Running standard of wastewater desalting station for steel-making enterprises
钢铁企业污水除盐站运行标准的制定
10.
weighing station
过秤台,秤站,磅站
11.
the station platform, staff
站台、 火车站员工.
12.
Study on Hydraulic Turbulence of Jilintai 2nd Stage Hydropower Station
吉林台二级水电站水力干扰过渡过程研究
13.
He stood on the platform.
他站在讲台(或站台)上。
14.
Discussion on Repetition Measurement of Basic Benchmark of Hydrometric Station
浅谈水文站基本水准点的复测与考证问题
15.
Hydropower Project Three-dimensional Standard Parts Database Based on CATIA
基于CATIA平台的水电三维标准件模板库
16.
Study on the flow aeration to prevent caviation of stepped spillway for Dachaoshan Hydroelectric Station
大朝山水电站台阶溢流坝掺气减蚀问题的研究
17.
Studies on the Jilintai First Class Power Station s Shot Firing Aggregate in Triaxial Test;
吉林台一级水电站爆破堆石料的三轴试验研究
18.
Research and Realization of Cross-Platform Hydropower Station Based on Web;
基于web的跨平台水电站系统研究与实现