1.
Study on Retrofit to Flow Passage of Domestic 300MW Steam Turbine and the Thermal Performance Test;
国产300MW汽轮机通流改造及电厂试验研究
2.
The Flow Path Retrofit and Evaluate Test of a 125MW Steam Turbine;
125MW汽轮机通流部分改造及评价试验
3.
Retrofit about Flow Path of 300MW Unit
300MW汽轮机通流部分改造分析
4.
Renovation of 200 MW Turboset Flow Path
200 MW汽轮机组通流部分改造
5.
Summary of economy of 600 MW steam turbine set's flow improvement in Harbin No.3 Power Plant
哈三电厂600MW汽轮机组通流改造经济性分析
6.
Analysis and Calculation of Structure Factor on Performance of 135 MW Turbine after Energy Saving Retrofit
结构因素对135MW汽轮机通流部分改造后性能影响的分析与计算
7.
Theoretical Calculation and Experimental Study on Retrofitting of Exhaust Passage of 300MW Steam Turbine;
300MW汽轮机排汽通道改造的理论计算与试验研究
8.
Theory study of the transformation for turbine exhaust passage
对汽轮机排汽通道改造的试验理论研究
9.
upgrading of old turbine-generation sets
老式汽轮机组的改造
10.
The reformation of steam passage part of#7 steam turbine set with advanced technology is carried out, the efficiency and the capacity of this old set are increased.
应用先进技术对#汽轮机通流部分进行了改造,使该老机组的效率及容量得到了提高。
11.
Retrofit of the Low-pressure Shaft Butt Seal in 51-50-3 Type Steam Turbine
51-50-3型汽轮机低压轴端汽封的改造
12.
Probe into Modernization of Two-cylinder Two exhaust 100 MW Steam Turbine
两缸两排汽100 MW汽轮机现代化改造
13.
Vapor Seal Transformation for 300MW Steam Turbines in Zhanjiang Power Plant
湛江电厂300MW汽轮机汽封改造
14.
Study of Transformation on NZ88/86/09 Turbine & Blower;
NZ88/86/09型汽轮机及鼓风机改造的研究
15.
Energy-saving reformation and evaluation of 200 MW unit steam turbines
200MW机组汽轮机节能改造及效果评估
16.
Renovation of Shaft Seal System of 220MW Turbo-generator Set
220MW汽轮发电机组轴封系统改造
17.
Economic Evaluation on Capacity Upgrade Project of 300 MW Home-made Turbine
国产300MW汽轮机增容改造经济性评价
18.
Reconstruction of Rubber-ball Cleaning System for N125MW Turbine Unit
N125MW汽轮机组胶球清洗系统改造与分析