说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 湾坝
1.
Number Investigation of Giant Panda(Ailuropoda melanoleuca) in Wanba Township and Comparison of Methods
贡嘎山湾坝乡大熊猫的数量调查及方法比较
2.
Study on Shear Strength of the Interfact between the Xiaowan Arch Dam Body Concrete and the Foundation Rock
湾坝体混凝土与基岩接触面抗剪强度研究
3.
The foundation of gated-weir of the Wanbahe Power Station is located on Quaternary deposit which is soft.
湾坝河水电站闸基坐落在第四纪砂砾石覆盖层上,属于软基上建闸。
4.
The Investigate of Measurement Method in Berm After Double-curvature Arch Dam of XiaoWan
小湾双曲拱坝坝后马道测量方法探讨
5.
Effects of seismic residual deformation of abutment rock on safety of Xiaowan arch dam
坝肩岩体地震残余变形对小湾拱坝安全度影响
6.
Research on Xiaowan Arch Dam s Abutment Stability and Reinforcing Treatment Measures;
小湾拱坝坝肩稳定及加固处理措施研究
7.
Finite element analysis of foundation unloading and relaxation effects of Xiaowan Arch Dam
小湾拱坝坝基开挖卸荷松弛效应的有限元分析
8.
Analysis on the Dam Stability of the Danger Removal and Reinforcement Project of Houwan Reservoir
后湾水库除险加固工程大坝稳定分析
9.
Study on the Properties of Concrete for Arch Dam of Xiaowan Hydropower Station
小湾水电站双曲拱坝混凝土性能研究
10.
Dynamic tracking simulation analysis of temperature field of Xiaowan Arch Dam during construction period
小湾拱坝施工期温度场动态跟踪仿真
11.
The Research on Xiao Wan High Arch Dam s Abutment Stability and Complex Geological Flaw s Generalized Simulation;
小湾高拱坝坝肩稳定分析及复杂地质缺陷概化模拟研究
12.
Study on Dam Stress Determination Based on Adaptive FEM and Plane FEM Stability Analysis for Xiaowan;
自适应有限元大坝应力取值研究及小湾拱坝平面稳定分析
13.
RESEARCH ON UNLOADING AND ZONATION OF ROCK MASS DAM FOUNDATION EXCAVATION-A CASE STUDY OF XIAOWAN HYDROPOWER STATION
坝基岩体开挖卸荷与分带研究——以小湾水电站坝基岩体开挖为例
14.
Application Spatial Variations in Slope of Deposit Body Located in Front of Xiao Wan Dam on Left;
小湾左岸坝前堆积体边坡的空间变异性研究
15.
Case study on operation and installation of UPVC pipe in Bingjin Wan silt storage dams
兵进湾淤地坝中UPVC管道施工安装技术实例研究
16.
Analysis of Result on Deformation Monitoring of Xiaowan Arch Dam Foundation Rock Mass
小湾水电站坝基岩体全过程变形监测成果分析
17.
Operation and Management of Cable Cranes in the Construction of Xiaowan Arch Dam
小湾水电站拱坝施工中缆机的运行管理与探索
18.
Comparison of Second Stage Artificial Cooling Schemes in Xiaowan Arch Dam
小湾拱坝二期冷却方案温控措施对比分析